10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>MAP</strong>-<strong>01</strong>-<strong>01</strong>1 – <strong>HFI</strong> <strong>Technical</strong> <strong>Guide</strong> (STGP 11)4.3.1.3 Produce Outline Basic Manning RequirementPurposeTo provide a formal record of the proposed platform manningrequirement to a level of detail required to support the URD /SRD. This is used as the basis for deriving the outlineAccommodation Statement and for costing the manpowerelement of the vessel’s WLC.To provide an early estimate of the manpower numbers requiredto operate and maintain the equipment, for input into the outlineBMR for the platform.Inputs • High-level manning options and policy constraints from theManning Concept (Chap 4).• SoCs for similar types of existing vessel.• Output from the initial support manning estimates (seeEstablish Maintenance Manpower Requirement (Chap 16)).• Outputs from the Produce Outline Manning (Chap 6) activityconducted on equipments for the platform.• High-level allocation of functions in equipment options(Chap 15).• Outline team organisation (Chap 5).Methods • Operational Scenario Description• Allocation of Function (Partitioning)• Task Analysis• Task Synthesis• Role Definition• [Project Specific] Target Audience Description• Job Design• Team Design• Complement Validation• <strong>Human</strong> <strong>Factors</strong> Trade-Off Analysis<strong>HFI</strong> ActivitiesNov 2006 Page 4-18 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!