10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 5 – Team Organisation5.3.4 Manufacture Phase Activities5.3.4.1 Finalise User RolesPurposeInputsMethodsTo finalise user roles of personnel required to operate andsupport the equipment.Results of user role assessment, equipment designdocumentation and specification of organisation.The <strong>HFI</strong> Methods, the Steps and the Output are the same as forOutline User Roles (5.3.2.1) in Assessment.Steps • The <strong>HFI</strong> Methods, the Steps and the Output are the same asfor Outline User Roles (5.3.2.1) in Assessment.• Final changes to the Watch and Station Bill may be made inconjunction with FLEET-NPS and DEC/IPT.OutputsDefinition of user roles/team organisation.5.3.4.2 Support Trials and <strong>Integration</strong>Purpose • To improve the team organisation design and maximiseoperational effectiveness.• To support integration of team organisation design withtraining requirements, recruitment, ILS.InputsDefinition of user roles/team organisation as per Finalise UserRoles (5.3.4.1).Methods • Job design• Task design• [Project Specific] Target Audience Description (PSTAD)StepsOutputsIterative process involving rolling review of the user roles/teamorganisation design with respect to the overall system designand changes occurring during the Manufacture phase. Alsoarising from any change in requirement identified as a result ofthe ongoing programme of acceptance and trials activities.Revised definition of user roles/team organisation.<strong>HFI</strong> ActivitiesNov 2006 Page 5-21 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!