10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>MAP</strong>-<strong>01</strong>-<strong>01</strong>1 – <strong>HFI</strong> <strong>Technical</strong> <strong>Guide</strong> (STGP 11)7.3.3 Manufacture Phase ActivitiesSee also Sect 7.3.2 Assessment / Demonstration / Manufacture Phase Activities.7.3.3.1 Procure Training SolutionPurposeInputsMethodsTo procure the training solution as identified from the TNAThe OPS, TPS and training objectives from the TNA.The outline training solution description and fidelity analysisresults from the TNA.Dependant on the nature of the training solution.Steps • Agree a procurement strategy.• Specify the outputs required of the training solution – theTPS and fidelity requirements.OutputsA procured training solution.7.3.3.2 Conduct Training DesignPurposeInputsTo design the training around the procured training solution.TNA Reports.Methods Training should meet the requirements of DSAT QS [Ref 3].Steps • See DTSM 1 [Ref 6]OutputsTraining Documentation and other supporting documentation.<strong>HFI</strong> ActivitiesNov 2006 Page 7-22 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!