10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>MAP</strong>-<strong>01</strong>-<strong>01</strong>1 – <strong>HFI</strong> <strong>Technical</strong> <strong>Guide</strong> (STGP 11)4.3.4 Manufacture Phase Activities4.3.4.1 Finalise Manning RequirementPurposeTo finalise the number and type of personnel required to operateand support the equipment.Inputs Product of the draft manning studies (see 4.3.3.2),Equipment allocation of functions and task synthesis (Chap 15),Team organisation and user roles (Chap 5).MethodsStepsOutputThe HF Methods, Steps and the Output are the same as forProduce Draft Manning Options (4.3.1.2).See HF methods and Tools.See HF methods and Tools.The manning estimates contribute to the Final QB.4.3.4.2 Finalise Quarter BillPurposeInputsMethodsTo produce the definitive manning requirement for FLEET NPSas the basis for the SoC.Modifications to the QB at this stage will not affect the overallnumbers and thus should not affect the Accommodation Statement,unless a design margin has been included at an earlierstage.Not identified.<strong>HFI</strong> ActivitiesSteps • Allowable modifications at this stage will generally beconfined to adjustments of individual stations against watchstate. However, if necessary, re-apportionment between thebranches (whilst maintaining numbers of Officers, SeniorRates and Junior Rates) may also be allowed withoutaffecting the design of the Ship or eroding the operationalaccommodation margins. Such changes will generally arisefrom outside the project, and will be co-ordinated by FLEET-NPS.• It is incumbent to FLEET NPS to inform the <strong>HFI</strong> Focus of anyproposed changes to the QB and/or the AccommodationStatement. Such changes remain subject to the project’sagreement up to acceptance of the Ship.• The <strong>HFI</strong> Focus is to inform the Supplier of any changes tothe QB &/or Accommodation Statement, since such changescould affect the detailed design and assessment activities.OutputFinal QBNov 2006 Page 4-26 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!