10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>MAP</strong>-<strong>01</strong>-<strong>01</strong>1 – <strong>HFI</strong> <strong>Technical</strong> <strong>Guide</strong> (STGP 11)<strong>HFI</strong> <strong>Technical</strong>AreaEquipment Layout<strong>HFI</strong> ActivityMonitor Feedbackfrom AcceptanceTrialsAssess WorkstationLayoutMANUFACTURE<strong>HFI</strong> Output• Confirmation of the acceptabilityof all habitability andenvironmental control systems.• Assessment of workstationlayout.<strong>MAP</strong>-<strong>01</strong>-<strong>01</strong>1Ref13.3.4.214.3.3.1Operability andUser-EquipmentInteractionMaintenance andSupportSafetyAssess User-Equipment InterfaceConsistencyAssess User-Equipment InterfaceEfficiency andEffectivenessAssess UserSupport FacilitiesAssess OperatingProceduresCo-ordinate <strong>HFI</strong>Aspects ofMaintenance WithTraining, Support,etc.MonitorMaintenanceOperability DuringAcceptance TrialsTransfer <strong>HFI</strong>Information to DLO• Assessments of the consistencyof the user-equipment interface.• Assessments of the effectivenessof the user-equipment interface.• Assessments of the efficiency ofthe user-equipment interface.• Assessments of the operatingprocedures.• Confirmation that all <strong>HFI</strong>maintenance and support issuesin <strong>HFI</strong> Log are closed off.• Check-list for future audit oftraining and support facilities andsystems.• Confirmation that maintenanceand support facilities andassociated documentation areacceptable.• Log of all outstanding operabilityissues and schedule for theirresolution.• Collated <strong>HFI</strong> data for use in Inserviceand disposal phases.Devise SystemSafety <strong>HFI</strong>AcceptanceCriteria 2 • Confirmation of the acceptabilityof all safety managementfacilities and systems.Provide HF Input toAcceptance Trials• Confirmation of the acceptabilityof all safety managementfacilities and systems.15.3.4.115.3.4.215.3.4.315.3.4.416.3.4.116.3.4.216.3.4.317.3.4.117.3.4.2Periodic <strong>HFI</strong> Audits • <strong>HFI</strong> Audit reports. 17.3.4.3Provide Support to • Input to project quality systemOther Projectrecords.Safety-RelatedActivities 3 • Specific <strong>HFI</strong> data.17.3.4.42Described under Manufacture Phase Activities but should start earlier. See also POSMS [Ref 37] SMP10.3Similar activity also applicable at other CADMID phases.Nov 2006 Page 2-40 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!