10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>MAP</strong>-<strong>01</strong>-<strong>01</strong>1 – <strong>HFI</strong> <strong>Technical</strong> <strong>Guide</strong> (STGP 11)12.3 <strong>HFI</strong> Activities12.3.1 Concept Phase Activities12.3.1.1 Traffic Flow ConceptPurposeTo provide a high-level analysis of traffic flow and routing tocontribute to emerging concepts about platform functions andthe General Arrangement.Inputs The General Arrangement Concept (Chap 8).MethodsNot Identified.Steps • Identify main evolutions associated with the movement ofpersonnel or materials for each major platform function.• Identify major traffic flows in each option for the GeneralArrangement.• Assess likely parameters of traffic flow for each routeincluding numbers, type of movement (watchkeepingchange, evacuation, embarkation etc.), rate of movement,type of material handling.• Perform trade-offs between traffic routes and GeneralArrangement.OutputsHigh-level traffic route options for each General Arrangementoption and assessment of viability, efficiency and safety issuesof each route (eg for Escape and Evacuation).<strong>HFI</strong> ActivitiesNov 2006 Page 12-12 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!