10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 2 – Introduction To <strong>HFI</strong> <strong>Technical</strong> Areas2.3.5 In-Service - Navigation Guidance Table<strong>HFI</strong> <strong>Technical</strong>AreaManpower,Complementing &Accommodation<strong>HFI</strong> ActivitySupportModificationIN-SERVICE<strong>HFI</strong> Output<strong>MAP</strong>-<strong>01</strong>-<strong>01</strong>1Ref• Revised QB. 4.3.5.1TeamOrganisationGeneralArrangementOperationalSpacesSupportModificationsProvide ProactiveSupportInput to In-Service<strong>HFI</strong> AuditSupportModification• Revised user roles/teamorganisation specification (asinputs to activities by thoseresponsible for trainingspecification, recruitment andILS).• Revised definition of userroles/team organisation.• Lessons learned (as input toappropriate organisations/databases to ensure these areutilised in the future).• <strong>HFI</strong> audit/log document (a livingdocument throughout In-Servicephase).• Information to stakeholders thatare in a position to benefit (e.g. infuture projects) from lessonslearned. May be via a nonprojectspecific organisation suchas SSG.• Workspace designs andassessments definingconformance with specificationsand standards.5.3.5.15.3.5.28.3.5.19.3.4.1AccommodationSpacesMiscellaneousSpacesPersonnelMovement &Material HandlingSupportModificationSupportModificationSupportModifications• Workspace assessmentsevaluating level of conformancewith specifications andstandards, including theAccommodation Definition.• Should in-service modificationsnecessitate changes to themiscellaneous spaces design,then the procedure for In-Service<strong>HFI</strong> activities (see Chap 8)should be followed.• Revised removal routes, trafficflow designs, storing and RASspecifications andembarkation/disembarkationarrangements as appropriate.10.3.4.111.3.312.3.5.1Provide ProactiveSupport• Revised personnel movementand material handling design.• Lessons learned (as input toappropriate organisations /databases to ensure these areutilised in the future)12.3.5.2Nov 2006 Page 2-41 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!