10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>MAP</strong>-<strong>01</strong>-<strong>01</strong>1 – <strong>HFI</strong> <strong>Technical</strong> <strong>Guide</strong> (STGP 11)• Develop <strong>HFI</strong> design rules in accordance with the GeneralArrangement <strong>HFI</strong> policy.• Define <strong>HFI</strong> design evaluation and acceptance criteria makinguse of parameters from the Health & Safety Analysis(Chap 17).Outputs<strong>HFI</strong> design rules for use in developing and evaluating the layoutand related acceptance criteria.8.3.3.2 Develop <strong>HFI</strong> Prototyping and DemonstrationRequirementsPurposeTo specify the critical aspects of the platform for whichprototyping or demonstrations are required to refine or prove thedesign prior to commitment in the build programme. Aspectsthat need to be considered are those which involve risk due touncertainty or where a number of options might exist whichcannot be rationalised from drawings or modelling.Inputs The <strong>HFI</strong> General Arrangement Policy (Sect 8.3.2.1).Methods • Task Analysis• Task SynthesisSteps • Collate all platform Task Analysis and Task Synthesisinformation.• Identify the critical tasks and design features that impingedirectly on the effective and safe conduct of these tasks.• Identify aspects of the General Arrangement that requireprototyping and demonstration to resolve <strong>HFI</strong> issues.• Specify the prototypes and demonstrations that willcontribute to design assessment and platform acceptance.<strong>HFI</strong> ActivitiesOutputs • <strong>Human</strong> factors prototyping and demonstration requirementsdocument specifying the following:o Identification of critical tasks and associated designissues for the General Arrangement in priority order ofsignificance.o <strong>HFI</strong> assessment criteria including those that willcontribute to formal acceptance.o The prototyping and demonstration requirementsschedule for Design and Manufacture stages.Nov 2006 Page 8-16 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!