10.07.2015 Views

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

MAP-01-011 HFI Technical Guide - Human Factors Integration ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>MAP</strong>-<strong>01</strong>-<strong>01</strong>1 – <strong>HFI</strong> <strong>Technical</strong> <strong>Guide</strong> (STGP 11)15.3 <strong>HFI</strong> Activities15.3.1 Concept Phase Activities15.3.1.1 Outline Use of AutomationPurposeInputsTo provide a baseline concept for the overall design of theequipment with a high-level view of the level of automation anduse of technology.Requirements for equipment.Methods • Operational Scenario Description.• <strong>Human</strong> <strong>Factors</strong> Trade-Off Analysis.Steps • Identify the operational performance requirements to beachieved in the system for projected Operational Scenarios.• Identify the manpower targets to be achieved in the systemrequiring automation of equipment functions (Chap 4).• Identify technologies to be applied in the equipment toachieve operational performance requirements withinmanpower constraints.• Collate information about lessons learned from the designand use of existing equipments in the RN and elsewhere.• Identify areas of the equipment to be automated anddetermine technological and human factors risks.• Perform initial high-level trade-offs in accordance with theEarly <strong>Human</strong> <strong>Factors</strong> Analysis (EHFA) User <strong>Guide</strong> (see also<strong>MAP</strong>-<strong>01</strong>-<strong>01</strong>0 [Ref 1] Chap 3).OutputsA high-level description of future equipment options describinguse of automation, user roles and human and technologicalrisks.<strong>HFI</strong> ActivitiesNov 2006 Page 15-18 Issue 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!