11.07.2015 Views

California State Rail Plan 2007-08 to 2017-18

California State Rail Plan 2007-08 to 2017-18

California State Rail Plan 2007-08 to 2017-18

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter XI – AmtrakFigure 11AAmtrak Five-Year Strategic <strong>Plan</strong> - Capital Projects – FFY 2005-09<strong>California</strong> ProjectsSummary of Project ScopeAmtrakFunding(000)Los Angeles Yard – NewEquipmentReplace electric carts and shop equipment $ 50Surfliner Equipment – Replace most parts due for renewal, along with someOverhaulsupgrades and structural repairs10,600Los Angeles Yard Install roof for commissary and material control building,Improvementswheel truing machine, sand <strong>to</strong>wer and industrial waste line2,400Service & Inspection Replace specialty <strong>to</strong>ols, equipment, etc. for LA and OAKFacilities Running Repair S&I Facilities7,500Los Angeles Yard Track Construct tracks <strong>to</strong> connect <strong>to</strong> 9 th Street 250Los Angeles UnionStation ImprovementsInstall tactile warning tiles on Tracks 10,11,12 350Oakland MaintenanceFacility Phase IIConstruction of Commissary and Welfare facilities 14,000Oakland MaintenanceFacility YardDemolish existing infrastructure in UP Yard 300Emeryville StationLease/PurchaseProvide funds for lease/purchase of the station 400Extension of PacificConstruct 1.8 miles of second mainline track, includingSurfliner Double-track –Centralized Traffic Control (CTC)CP Flores <strong>to</strong> CP O’Neal1,250San Diego – NewLayover and LightMaintenance FacilityParticipate in the construction of a multi-s<strong>to</strong>ry building, ofwhich the first floor is <strong>to</strong> be used by Amtrak and Caltrans <strong>to</strong>s<strong>to</strong>re equipment and materials needed for rolling s<strong>to</strong>ckmaintenanceOakland – Station and Construct station track, platform, and control pointPlatform Improvements improvements680Rocklin Station Construct improvements <strong>to</strong> meet ADA Requirements 250Capi<strong>to</strong>l CorridorInstall Closed Circuit Television in 8 stations along Capi<strong>to</strong>lCorridor300San Joaquin RouteInstall Closed Circuit Television in 8 stations along SanJoaquin Route300Salinas Station Reconstruct Salinas Platform 2,525<strong>California</strong> Projects Total $ 41,505Multi-<strong>State</strong> Projects<strong>Rail</strong> Replacement andRehabilitation – Pacificand Southwest DivisionsSuperliner II Equipment –OverhaulsSuperliner I Equipment –OverhaulsF59PHI DieselLocomotive OverhaulsWestern DivisionPollution PreventionReplace and rehabilitate rail, wood ties, and turnouts $ 6,400Replace most parts due for renewal, along with someupgrades and structural repairs35021,200Modify or remanufacture existing equipment 13,600Replace most parts due for renewal, along with someupgrades and structural repairs5,200Construct pollution prevention upgrades and improvements 2,220Multi-<strong>State</strong> Projects Total $ 48,620GRAND TOTAL $ 90,125<strong>18</strong>9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!