11.07.2015 Views

California State Rail Plan 2007-08 to 2017-18

California State Rail Plan 2007-08 to 2017-18

California State Rail Plan 2007-08 to 2017-18

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter II – Capital ProgramFigure 2ARouteUnconstrained Ten-Year Intercity <strong>Rail</strong> Capital Program Project CostsFY <strong>2007</strong>-<strong>08</strong> through FY <strong>2017</strong>-<strong>18</strong>($ in millions)Track andSignalStationsGradeCrossingsRolling S<strong>to</strong>ckandMaintenanceFacilitiesTotal CostEXISTING ROUTESPacific Surfliner - North $ 599.0 $ 57.3 $ - 1 $ 656.3Pacific Surfliner - South $ 1,000.2 $ 151.5 $ 365.0 $ 125.0 $ 1,641.7San Joaquin $ 472.9 $ 36.3 $ - $ 83.0 $ 592.2Capi<strong>to</strong>l Corridor $ 286.6 $ 114.7 $ 67.0 $ 82.0 $ 550.3Sub<strong>to</strong>tal $ 2,358.7 $ 359.8 $ 432.0 $ 290.0 $ 3,440.5PROPOSED ROUTES 2Coast $ 495.9 $ 10.3 $ 14.0 $ 70.0 $ 590.2TOTAL $ 2,854.6 $ 370.1 $ 446.0 $ 360.0 $ 4,030.71 Included in Pacific Surfliner - South.2 Based on Amtrak's <strong>California</strong> Passenger <strong>Rail</strong> 20-Year Improvement <strong>Plan</strong>.Capital Costs for other proposed routes (Reno and Redding) were not studied in the Amtrak <strong>Plan</strong>,and current comparable cost estimates are not available.PROJECTED CAPITAL PROJECTSFigure 2B is the proposed list of projects that comprise the unconstrained capitalprogram for the Pacific Surfliners, San Joaquins, Capi<strong>to</strong>l Corridor andCoast Route. The projects are not listed in priority order.19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!