11.07.2015 Views

California State Rail Plan 2007-08 to 2017-18

California State Rail Plan 2007-08 to 2017-18

California State Rail Plan 2007-08 to 2017-18

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CAPITAL IMPROVEMENT OBJECTIVES – FUNDED:• Construct Oceanside passing track.• Replace single-track Santa Margarita River bridge with new two-trackconcrete bridge and connect with double track siding.• Extend platform at Sorren<strong>to</strong> Valley Station.• Build 500-space parking structure at Solana Beach Station for mixed-usedevelopment.UNFUNDED OR UNDERFUNDED:• Replace single-track San Diegui<strong>to</strong> River bridge with new two-track concretebridge.• Replace single-track San Luis Rey River bridge with new two-track concretebridge and connect <strong>to</strong> with double track siding.• Replace single-track San Mateo Creek bridge’s north approach with newconcrete bridge approach.• Replace other single-track timber bridges with new double-track concretebridges, including seven bridges in Sorren<strong>to</strong> Valley and one bridge inCardiff.• Sorren<strong>to</strong> <strong>to</strong> Miramar second track and curve straightening.• Continue stabilization of Del Mar Bluffs.• Extend platforms at Poinsettia Station.METROLINK COMMUTER RAIL (LOS ANGELES,ORANGE, RIVERSIDE, SAN BERNARDINO, ANDVENTURA COUNTIES)PRINCIPAL <strong>2007</strong>-<strong>08</strong> <strong>to</strong> <strong>2017</strong>-<strong>18</strong> ROUTE OBJECTIVES• Improve cus<strong>to</strong>mer service and accessibility.• Improve integration with other transit services.• Purchase 107 new rail cars.• Design and construct Sealed Corridor safety improvements on SCRRAownedlines.• Complete system-wide rail line rehabilitation/renovation projects.• Construct Eastern Area maintenance facility.• Perform various projects <strong>to</strong> improve system performance.• Purchase and rebuild 15 used locomotives.• Complete Lincoln Avenue double-track.• Construct additional platform and track at LAUS (mail dock).10 Executive Summary <strong>California</strong> <strong>State</strong> <strong>Rail</strong> <strong>Plan</strong> <strong>2007</strong>-<strong>08</strong> <strong>to</strong> <strong>2017</strong>-<strong>18</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!