11.07.2015 Views

California State Rail Plan 2007-08 to 2017-18

California State Rail Plan 2007-08 to 2017-18

California State Rail Plan 2007-08 to 2017-18

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter II – Capital ProgramFigure 2B (continued)Unconstrained Capital Program ProjectsPacific Surfliner RouteCapital Projects <strong>2007</strong>-<strong>08</strong> through <strong>2017</strong>-<strong>18</strong>Project Description Cost ($000)Pacific Surfliner Route - SouthSTATION PROJECTSStation Improvements* Multiple Stations $ 23,275Solana Beach Station Parking Structure $ <strong>18</strong>,000LA S<strong>to</strong>rage Track $ 38,100Fuller<strong>to</strong>n Station Parking Structure $ 25,200Multiple Stations Ticket Vending Machinges $ 10,400Multiple Stations Electronic Passenger InformationSystems$ 1,500LA Union Station Station Tracks and Platforms $ 35,000Sub<strong>to</strong>tal Station Projects $ 151,475TRACK AND SIGNAL PROJECTSOceanside Double Track 1.2 miles of double track $ 13,603Del Mar Bluff Stabilizations Stabilze Bluff Area $ 12,735San Diegui<strong>to</strong> River Bridge Construct double track concrete bridge $ 34,428Sorren<strong>to</strong>-Miramar Double Track Construct second main track $ 27,600Carlsbad Double Track Project $ 17,700Double Track - San Diego County Various Locations $ 80,000Replace wooden trestle and bridges and ConstructSecond SpansVarious Locations $ 100,000LA Union Station Run Through Tracks $ 500,000LA-Fuller<strong>to</strong>n Triple Tracks $ 100,000Santa Margarita Bridge Replace bridge-construct double track $ 39,200CP Pulgas <strong>to</strong> MP 423 Second Main Track San Diego County $ 28,400Selected Corridor Improvements* Security and Communications upgrades $ 39,900Capitalized Maintenance* $ 6,650Sub<strong>to</strong>tal Track and Signal Projects $ 1,000,216GRADE SEPARATION PROJECTSCity of Encinitas Grade Separation 3 Pedestrian Grade Separations $ 15,000Leucadia Grade Separation Grade Separation San Diego County $ 50,000LA-Fuller<strong>to</strong>n Grade Separations 6 Grade Separations $ 300,000Sub<strong>to</strong>tal Grade Separation Projects $ 365,000MAINTENANCE FACILITIES AND EQUIPMENT PROJECTSSan Diego Layover Facility $ 50,000Equipment 3 Train Sets $ 75,000Sub<strong>to</strong>tal Maintenance Facilities and Equipment Projects $ 125,000Sub<strong>to</strong>tal Pacific Surfliner Route - South $ 1,641,691GRAND TOTAL - PACIFIC SURFLINER ROUTE $ 2,297,966* - Pacific Surfliner Route project split: North 33.5%-South 66.5%, includes South portion of these projects.21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!