13.07.2015 Views

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>DOE</strong>-<strong>STD</strong>-I090-<strong>96</strong> (Rev-I)8. Direct operations ifan accident orinjury occurs.d. The operator or other designated personshall visually examine the hoist in accordance withthe requirements for a daily inspection describedin Section 8.2, "Inspections."e. A qualified person shall examine anydeficiencies <strong>and</strong> determine whether they constitutea hazard. Correct these deficiencies before .operating the hoist.f. Load lines shall be checked after strain isput on them, before the load is lifted clear oftheground. Ifnot plumb, the slings or equipmentshall be repositioned so that the lines are plumbbefore continuing.8.5.7 Critical LiftsSee Chapter 2, "Critical Lifts," for critical-liftrequirements.8-17Chapter 8Hoists

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!