<strong>DOE</strong>-<strong>STD</strong>-I090-<strong>96</strong> (Rev-I)tables, or diagrams showing the rated capacity,boom angle, swing, <strong>and</strong> stability data are posted inconvenient view ofthe operator.k. Check load lines after strain is put on thembut before the load is lifted clear ofthe ground; ifload lines are not plumb, reposition the slings orequipment so that the lines are plumb beforecontinuing.9.5.10 Critical LiftsSee Chapter 2, "Critical Lifts," for critical-liftrequirements.9-27Chapter 9Mobile Cranes