DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...
DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...
DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>DOE</strong>-<strong>STD</strong>-<strong>1090</strong>-<strong>96</strong> (Rev-l)the platform) to eachlocation at which theplatform is to behoisted <strong>and</strong> positioned. Thedesignated leader <strong>and</strong> the operator shall determinethat:1. Crane (mobile) footing is adequate.2. System controls <strong>and</strong> safety devices areactivated <strong>and</strong> functioning properly.3. No interferences exist.4. Configuration necessary to reach worklocations will allow the crane to remain under 50percent ofrated capacity.NOTE: Materials <strong>and</strong> tools to beused during theaetuallift, ifsecured to prevent displacement, canbe in the platformfor the test lift.NOTE: A single trial lift may be performed for alllocations to be reached from a single setupposition.h. The trial lift shall be repeated prior tohoisting employees whenever:1. The crane (mobile) travels or is moved<strong>and</strong> set up in a new location or returned to apreviously used location.2. The lift route is changed, unless theoperator determines that the safety ofthe hoistedpersonnel is not affected.i. A visual inspection ofthe crane, rigging, <strong>and</strong>personnel platform shall be conducted by aqualified inspector immediately after the trial lift,prior to lifting personnel. Any defects found thatcreate a safety hazard shall be corrected prior tohoisting personnel.j. Mter the trial lift <strong>and</strong> just before hoistingpersonnel, the platform shall be lifted a few inches<strong>and</strong> inspected to ensure that it is secure <strong>and</strong>properly balanced. Personnel shall not be hoistedunless the following conditions exist:1. Hoist ropes are free ofkinks.2. Multiple-part lines are not twistedaround each other.3. The primary attachment is centeredover the platform.4. Ropes are properly seated on drums<strong>and</strong> sheaves.k. These special procedures shall be followedwhen lifting personnel:1. The crane shall be inspected dailyprior to lifting personnel, in accordance with therequirements for frequent inspections for the typeofequipment being used.2. Thelifting <strong>and</strong> supporting shall bemade under controlled conditions <strong>and</strong> under thedirection ofa designated leader. A qualifiedsignaler shall be appointed.3. Prior to each working shift, thepersonnel lift platform <strong>and</strong> rigging shall beinspected.4. Communications between the craneoperator, signaler, <strong>and</strong> persons being lifted shallbe maintained throughout the lift.5. The employees being hoisted, moved,or positioned shall remain in continuous sight of,<strong>and</strong> in direct communication with, the operator orsignaler. In situations where direct visual contactwith the operator is not possible <strong>and</strong> the use ofasignaler would create a hazard for that person,direct communication alone (such as two-wayradio) may be used.6. Tag lines shall be used unless their usecreates an unsafe condition.7. The crane shall be operated so thatlowering will be power-controlled (no free-fall).8. When welding is done bypersonnelfrom the platform or basket, the electrode holdersshall be protected from contact with metalcomponents ofthe personnel platform orbasket.9. Employees working from a platformshall wear body belts/harnesses with lanyardsattached to the lower load block or overhaul ball,or to a structural member within the platform thatis capable ofsupporting a fall impact. Whenworking above water, the requirements of29 CFR1926.106 (Occupational Safety <strong>and</strong> HealthRegulations for Construction) shall also apply.10. The operator shall remain at thecontrols when the personnel platform is occupied.11. Movement ofthe personnel platformshall be done in a slow, controlled, cautiousChapter 15Construction <strong>Hoisting</strong> <strong>and</strong> <strong>Rigging</strong>Equipment Requirements 15-32