13.07.2015 Views

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>DOE</strong>-<strong>STD</strong>-<strong>1090</strong>-<strong>96</strong> (Rev-l)the platform) to eachlocation at which theplatform is to behoisted <strong>and</strong> positioned. Thedesignated leader <strong>and</strong> the operator shall determinethat:1. Crane (mobile) footing is adequate.2. System controls <strong>and</strong> safety devices areactivated <strong>and</strong> functioning properly.3. No interferences exist.4. Configuration necessary to reach worklocations will allow the crane to remain under 50percent ofrated capacity.NOTE: Materials <strong>and</strong> tools to beused during theaetuallift, ifsecured to prevent displacement, canbe in the platformfor the test lift.NOTE: A single trial lift may be performed for alllocations to be reached from a single setupposition.h. The trial lift shall be repeated prior tohoisting employees whenever:1. The crane (mobile) travels or is moved<strong>and</strong> set up in a new location or returned to apreviously used location.2. The lift route is changed, unless theoperator determines that the safety ofthe hoistedpersonnel is not affected.i. A visual inspection ofthe crane, rigging, <strong>and</strong>personnel platform shall be conducted by aqualified inspector immediately after the trial lift,prior to lifting personnel. Any defects found thatcreate a safety hazard shall be corrected prior tohoisting personnel.j. Mter the trial lift <strong>and</strong> just before hoistingpersonnel, the platform shall be lifted a few inches<strong>and</strong> inspected to ensure that it is secure <strong>and</strong>properly balanced. Personnel shall not be hoistedunless the following conditions exist:1. Hoist ropes are free ofkinks.2. Multiple-part lines are not twistedaround each other.3. The primary attachment is centeredover the platform.4. Ropes are properly seated on drums<strong>and</strong> sheaves.k. These special procedures shall be followedwhen lifting personnel:1. The crane shall be inspected dailyprior to lifting personnel, in accordance with therequirements for frequent inspections for the typeofequipment being used.2. Thelifting <strong>and</strong> supporting shall bemade under controlled conditions <strong>and</strong> under thedirection ofa designated leader. A qualifiedsignaler shall be appointed.3. Prior to each working shift, thepersonnel lift platform <strong>and</strong> rigging shall beinspected.4. Communications between the craneoperator, signaler, <strong>and</strong> persons being lifted shallbe maintained throughout the lift.5. The employees being hoisted, moved,or positioned shall remain in continuous sight of,<strong>and</strong> in direct communication with, the operator orsignaler. In situations where direct visual contactwith the operator is not possible <strong>and</strong> the use ofasignaler would create a hazard for that person,direct communication alone (such as two-wayradio) may be used.6. Tag lines shall be used unless their usecreates an unsafe condition.7. The crane shall be operated so thatlowering will be power-controlled (no free-fall).8. When welding is done bypersonnelfrom the platform or basket, the electrode holdersshall be protected from contact with metalcomponents ofthe personnel platform orbasket.9. Employees working from a platformshall wear body belts/harnesses with lanyardsattached to the lower load block or overhaul ball,or to a structural member within the platform thatis capable ofsupporting a fall impact. Whenworking above water, the requirements of29 CFR1926.106 (Occupational Safety <strong>and</strong> HealthRegulations for Construction) shall also apply.10. The operator shall remain at thecontrols when the personnel platform is occupied.11. Movement ofthe personnel platformshall be done in a slow, controlled, cautiousChapter 15Construction <strong>Hoisting</strong> <strong>and</strong> <strong>Rigging</strong>Equipment Requirements 15-32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!