13.07.2015 Views

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>DOE</strong>-<strong>STD</strong>-I090-<strong>96</strong> (Rev-I)4. Ensure that equipment is properly setup <strong>and</strong> positioned.5. Ensure that a signaler is assigned, ifrequired, <strong>and</strong> is identified to the operator.6. Direct the lifting operation to ensurethat the lift is completed safely <strong>and</strong> efficiently.7. Stop the job when any potentiallyunsafe condition is recognized.8. Direct operations if an accident orinjury occurs.15.5.3.4 Critical liftsa. The operating organization shall appoint onePIC ofthe lifting operation. This person shallmeet the definitions of appointed, designated, <strong>and</strong>qualified, as described in Section 15.2,"Definitions."b. The PIC shall ensure that a pre-job plan isprepared that defmes the operation <strong>and</strong> shallinclude the following:1. Identification ofthe items to bemoved, the weight, dimensions, center ofgravity,<strong>and</strong> the presence ofhazardous or toxic materials.2. Identification offorklifts to be used bytype <strong>and</strong> rated capacity.3. <strong>Rigging</strong> sketches that include (asapplicable):i. Identification <strong>and</strong> rated slings,lifting bars, rigging accessories,<strong>and</strong> below-the-hook liftingdevices.ii.iii.iv.Load-indicating devices.Load vectors.Lifting points.v. Sling angles.vi.vii.Boom <strong>and</strong> swing angles.Methods of attachment.viii. Forklift orientations.ix.Other factors affectingequipment capacity.4. Operating procedures <strong>and</strong> specialinstructions to operators including riggingprecautions <strong>and</strong> safety measures to be followed asapplicable.c. Only experienced operators who have beentrained <strong>and</strong> qualified to operate the specificequipment to be used shall be assigned to makethe lift.d. Only designated, qualified signalers shallgive signals to the operator. However. obO'STOP signal at all times no matter who gives the~e. The responsible manager or designee shallreview <strong>and</strong> approve the procedure <strong>and</strong> riggingsketches before the lift is made.15.5.3.5 Lifting of PersonnelTake the following precautions wheneverpersonnel are elevated with a forklift truck:a. Use a lift platform manufactured for thepurpose oflifting personnel with a forklift truckthat meets the requirements ofASME B56.1.b. Ensure that a restraining means (h<strong>and</strong>rails orchains) exists that is capable ofwithst<strong>and</strong>ing aforce of200 pounds in any direction; ifnorestraining means is provided, personnel on theplatform shall wear a body harness with lanyard ordeceleration device.c. When being supported by a forklift, thepersonnel platform shall be attached in such amanner that it cannot slide or bounce offthe forks.d. The operator shall remain in the controlposition ofthe forklift truck or means shall beprovided whereby personnel on the platform canshut power offto the forklift truck.e. Overhead protection, as indicated necessaryby operating conditions, shall be provided.f. Means shall be provided to protect personnelfrom moving parts ofthe forklift truck thatpresent a hazard when the personnel platform is inthe normal working position.g. Do not transport personnel from one locationto another while they are on the work platform.15-37Chapter 15Construction <strong>Hoisting</strong> <strong>and</strong> <strong>Rigging</strong>Equipment Requirements

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!