13.07.2015 Views

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>DOE</strong>-<strong>STD</strong>-I090-<strong>96</strong> (Rev-I)9.2.6.3 Hydraulic <strong>and</strong> Pneumatic Pumps <strong>and</strong> Motors 9-89.2.6.4 Hydraulic <strong>and</strong> Pneumatic Valves. . . . . . . . . . . . . . . . . . . . . . . . . 9-89.2.6.5 Hydraulic <strong>and</strong> Pneumatic Cylinders. . . .. . . . . . . . . . . . . . . . . . . 9-89.2.6.6 Hydraulic Filters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-89.2.6.7 Wire Rope 9-89.2.7 Load HoodsILoad Blocks. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-99.2.8 Cranes Not in Regular Use 9-109.3 TESTING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 9-119.3.1 Operational Tests 9-119.3.2 Rated Load Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 9-119.4 MAINTEN.AN"CE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 9-129.4.1 Preventive Maintenance 9-129.4.2 Maintenance Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 9-129.4.3 Wire-Rope Maintenance . . . . . . . . . . .. 9-129.5 OPERATION , 9-139.5.1 Conduct ofOperator. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 9-139.5.1.1 Traveling the Machine 9-149.5.1.2 Making Adjustments or Repairs 9-149.5.1.3 Ensuring Stability , 9-149.5.1.4 Observing Boom-Length Precautions. . . . . . . . . . . . . . . . . . . .. 9-159.5.2 Operating Near Power Lines <strong>and</strong> Transmitter Towers . . . . . . . . . . . . . . . .. 9-159.5.2.1 Crane Operations De-energized <strong>and</strong> Grounded ElectricalPower Lines 9-189.5.2.2 Power Lines Energized, Crane Operating Less ThanErectedIFully Extended Boom Length Away FromProhibited Zone 9-189.5.2.3 Crane Operations are Within the Prohibited Zone <strong>and</strong> thePower Lines are Energized . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 9-189.5.2.4 Crane in Transit with no Load <strong>and</strong> Boom Lowered. . . . . . . . . .. 9-209.5.2.5 Crane Operations Near Transmitter Towers 9-209.5.3 Hoist-Limit Switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 9-209.5.4 <strong>St<strong>and</strong>ard</strong> H<strong>and</strong> Signals 9-209.5.5 Identification ofSignalers . . . . . . . . .. 9-209.5.6 Size ofLoad . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 9-239.5.7 Attaching the Load . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . .. 9-239.5.8 Moving the Load 9-239.5.9 OrdinaryLifts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 9-239.5.10 Critical Lifts 9-27Exhibit I Mobile Crane Load Test <strong>and</strong> Inspection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 9-29CHAPTER 10FORKLIFT TRUCKS10.1 GENERAL10-1viii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!