<strong>DOE</strong>-<strong>STD</strong>-I090-<strong>96</strong> (Rev-I)2.2 CRITICAL-LIFT REQUIREMENTSa. Ensure that the requirements are met forordinary lifts specified in each section ofthisst<strong>and</strong>ard for each particular equipment category.b. The operating organization shall appoint aPIC for the entire operation. This person shallmeet the defmitions of appointed, designated, <strong>and</strong>qualified as described in Chapter 1, "Terminology<strong>and</strong> Defmitions," <strong>and</strong> shall bepresent at the liftsite during the entire lifting operation.c. The PIC shall ensure that a pre-job plan orprocedure is prepared that defmes the operation<strong>and</strong> includes the following:1. Identification ofthe items to bemoved, the weight, dimensions, <strong>and</strong> center ofgravity ofthe load, <strong>and</strong> any hazardous or toxicmaterials that are present2. Identification ofoperating equipmentto be used by type <strong>and</strong> rated capacity3. <strong>Rigging</strong> sketches that include (asapplicable):i. Identification <strong>and</strong> rated capacityofslings, lifting bars, riggingaccessories, <strong>and</strong> below-the-hooklifting devices.ii.iii.iv.Load-indicating devices.Load vectors.Lifting points.v. Sling angles.vi.vii.Boom <strong>and</strong> swing angles.Methods ofattachment.viii. Crane orientations.ix.Other factors affectingequipment capacity.4. Operating procedures <strong>and</strong> specialinstructions to operators including riggingprecautions <strong>and</strong> safety measures to be followed asapplicable.d. Experienced operators who have beentrained <strong>and</strong> qualified to operate the specificequipment to be used shall be assigned to makethe lift.e. Only designated, qualified signalers shallgive signals to the operator. However. theoperator shall obey a STOP signal at all times.no matter who gives the signal.f. The procedure <strong>and</strong> rigging sketches shall bereviewed <strong>and</strong> approved by the responsiblemanager (or designee) <strong>and</strong> the responsible oversiteorganization (such as safety, quality assurance, orquality control) before the lift is made.g. A pre-lift meeting involving partiCipatingpersonnel shall be conducted prior to making acritical lift. The critical lift plan/procedure shallbe reviewed <strong>and</strong> questions shall be resolved.Chapter 2Critical Lifts 2-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!