13.07.2015 Views

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>DOE</strong>-<strong>STD</strong>-I090-<strong>96</strong> (Rev-I)include the following:1. Ensure that personnel involvedunderst<strong>and</strong> how the lift is to be made.2. Ensure that the weight ofthe load isdetermined. that proper equipment <strong>and</strong> accessoriesare selected. <strong>and</strong> that rated capacity is notexceeded.3. Survey the lift site forhazardous/unsafe conditions.4. Ensure that equipment is properly setup <strong>and</strong> positioned.5. Ensure that a signaler is assigned. ifrequired. <strong>and</strong> is identified to the operator.i. Identification <strong>and</strong> rated capacityofslings, lifting bars, riggingaccessories. <strong>and</strong> below-the-hooklifting devices.ii.iii.iv.Load-indicating devices.Load vectors.Lifting points.v. Sling angles.vi.vii.Boom <strong>and</strong> swing angles.Methods of attachment.viii. Crane orientations.6. Direct the lifting operation to ensurethat the lift is completed safely <strong>and</strong> efficiently.ix.Other factors affectingequipment capacity.7. Stop the job when any potentiallyunsafe condition is recognized.8. Direct operations if an accident orinjury occurs.e. The designated leader shall inspect all cranesto ensure that they are still within the inspectioninterval.f. The designated leader shall inspect all liftingdevices to ensure that the rated capacity oftheseitems ofequipment will not be exceeded.15.5.2.6 Critical Liftsa. The operating organization shall appoint aperson-in-charge (PIC) ofthe lifting operation.This person shall meet the definitions ofappointed. designated. <strong>and</strong> qualified. as describedin Section 15.2. "Definitions:'b. The PIC shall ensure that a pre-job plan isprepared that defmes the operation <strong>and</strong> shallinclude the following:1. Identification ofthe items to bemoved. the weight. dimensions. center ofgravity.<strong>and</strong> the presence ofhazardous or toxic materials.2. Identification ofcranes to be used bytype <strong>and</strong> rated capacity.3. <strong>Rigging</strong> sketches that include (asapplicable):4. Operating procedures <strong>and</strong> specialinstructions to operators including riggingprecautions <strong>and</strong> safety measures to be followed asapplicable.c. Only experienced operators who have beentrained <strong>and</strong> qualified to operate the specificequipment to be used shall be assigned to makethe lift.d. Only designated, qualified signalers shallgive signals to the operator. However. obey aSTOP signal at all times no matter who gives thesienal.e. The responsible manager or designee shallreview <strong>and</strong> approve the procedure <strong>and</strong> riggingsketches before the lift is made.15.5.2.7 Lifting Personnela. Do not lift, lower, swing, or travel the craneor forklift while a worker is on the hook. load,personnel platform. boom. or personnel-liftingdevice attached to the crane hoist rope. boom. ortines except as described in the paragraphs below.b. The person specifically responsible for theoverall work function to be performed shalldetermine that there is no practical alternativemachine or equipment to perform the work, suchas a ladder. scaffold. stairway. aerial lift, orpersonnel hoist. Ifa determination is made thatlifting by crane or forklift is required. theconstruction management contractor shall beChapter 15Construction <strong>Hoisting</strong> <strong>and</strong> <strong>Rigging</strong>Equipment Requirements 15-30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!