13.07.2015 Views

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

DOE-STD-1090-96, DOE Standard Hoisting and Rigging Manual ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>DOE</strong>-<strong>STD</strong>-I090-<strong>96</strong> (Rev-!)the part oftrained operators/riggers, <strong>and</strong> the use ofequipment that is reliable, properly designed, inspected,<strong>and</strong> maintained. Although not m<strong>and</strong>atory at all <strong>DOE</strong> sites <strong>and</strong> locations, this st<strong>and</strong>ard has been used formany years by<strong>DOE</strong> <strong>and</strong> its contractors as a valuable resource for conducting hoisting <strong>and</strong> rigging safely <strong>and</strong>efficiently <strong>and</strong> as the st<strong>and</strong>ard against which to judge all hoisting <strong>and</strong> rigging programs. The fullimplementation ofthe requirements <strong>and</strong> recommendations of this st<strong>and</strong>ard will dramatically strengthenhoisting <strong>and</strong> rigging programs throughout the <strong>DOE</strong> complex <strong>and</strong> will significantly decrease the probability ofserious accidents resulting in personnel injury or death or severe property damage.When organizations operating under nuclear energy programs are required to use <strong>DOE</strong> document NE F8-6T,those organizations shall use a combination ofit <strong>and</strong> The <strong>DOE</strong> <strong>Hoisting</strong> <strong>and</strong> <strong>Rigging</strong> <strong>St<strong>and</strong>ard</strong>. Whereconflicts exist, this st<strong>and</strong>ard shall be given priority since it is being kept current <strong>and</strong> NE F8-6T has not beenrevised since 1985.To propose improvements to the st<strong>and</strong>ard, please use the copy ofthe form at the back. All requests orsuggestions for improvement should be submitted to:<strong>Hoisting</strong> <strong>and</strong> <strong>Rigging</strong> Project ManagerU.S. Department ofEnergyEH-51, 270 CC19901 Germantown RoadGermantown, MD 20874-1290Introduction - 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!