e. Data indicating chloride ion content information for each admixture<br />

6. Concrete compressive strength data as required by ACI 318.<br />

7. Concrete Supplier Approval.<br />

8. Chloride-Ion Content: Measured water-soluble chloride-ion content (percent by weight of cementitious<br />

materials) in accordance with ASTM C 1218.<br />

9. Time of Initial Setting: Initial setting time in accordance with ASTM C 403.<br />

I. Slab Reinforcing Bar Shop Drawings:<br />

1. Complete information for installing reinforcing, including placement plans, bar bending diagrams, splice<br />

lengths and locations, bar spacing, concrete cover, support devices and accessories.<br />

2. Conform with ACI SP 66 and ACI 318<br />

3. Perimeter foundation tie reinforcing submittals as specified in Section 03310.<br />

J. Product Data: Brand name, chemical composition, installation directions and certificates of compliance with<br />

required standards for the following products:<br />

1. Doweling system for construction joints<br />

2. Doweling system for sawed contraction joints (if required)<br />

3. Temporary film forming curing compound<br />

4. Vapor retarder (If required) and tape<br />

K. Slab Joint and Placement Plan:<br />

1. Provide a pour plan identifying the following:<br />

a. Exterior walls and column grid locations.<br />

b. Truck access location.<br />

c. Extent of pours including width, length, slab placement area and volume.<br />

d. Locations of construction joints.<br />

e. Location of sawn contraction joints if different from those shown or if not shown on the drawings.<br />

2. Slab joint and placement plan shall be developed and submitted on a full-sized copy of the Architectural<br />

Floor Plan.<br />

L. Pre-Slab Installation Meeting:<br />

1. Provide record of notification of pre-slab meeting including company name, persons contacted, and date<br />

and method of contact.<br />

2. Provide meeting minutes to all participants and Wal-Mart Construction Manager including sign-in sheet.<br />

M. Delivery Tickets:<br />

1. Copies of delivery tickets for each load of concrete delivered to site.<br />

2. Indicate on each ticket information required by ASTM C94 including additional information required for<br />

slabs.<br />

3. Information on ticket shall include quantities of all material batched including the amount of free water in<br />

the aggregate and the quantity of water that can be added at the site without exceeding the maximum water<br />

cement ratio of the approved mix design. Aggregate moisture corrections shall be based on ASTM<br />

definitions of aggregate moisture content and absorption.<br />

4. Mix identification number on ticket shall match number on submitted and approved mix design.<br />

1.4 TESTING<br />

A. Wal-Mart Construction Testing Laboratory (CTL) will perform concrete testing and inspection specified in Part 3<br />

and elsewhere in this section as specified at no cost to the Contractor in accordance with Section 01458 - Testing<br />

Laboratory Services.<br />

B. CTL is neither authorized to change any specified requirement nor to approve any portion of the work.<br />

03312-4<br />

<strong>Walmart</strong> #<strong>1186</strong> – <strong>Liberty</strong>, <strong>TX</strong> 04/20/11<br />

CMA/10118.034

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!