06.09.2015 Views

PROJECT MANUAL Specifications Seafood Removal Walmart Store No 1186 Liberty TX

Specs - Home

Specs - Home

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Wal-Mart Observation Log within 24 hours.<br />

J. Deviations from the Contract Documents, as defined above, shall be logged onto the Wal-Mart Observation Log<br />

by the CTL/SI representative on site. (www.bldgportal.com, enter username and password, select Observation<br />

Log). Follow instructions on the Observation Log website for entry of information.<br />

K. The Wal-Mart Construction Manager in conjunction with the CTL and/or SI will determine when to involve the<br />

AOR or EOR for remedial action.<br />

PART 2 PRODUCTS<br />

<strong>No</strong>t Used.<br />

PART 3 EXECUTION<br />

3.1 PRODUCTION TESTING<br />

A. General Requirements:<br />

1. Testing shall be conducted as specified in the individual specification sections.<br />

2. Tests and inspections shall, as a minimum, be performed by Technical I (TI) inspector if not otherwise<br />

specified in the individual section.<br />

3. If inspection of fabricators work is required, the Owner's representative may require testing and inspection<br />

of the work at the plant before shipment.<br />

4. Testing and inspection shall be performed in accordance with the industry standard used as the reference<br />

for the specific material or procedure unless other criteria are specified. In the absence of a referenced<br />

standard, tests shall be accomplished in accordance with generally accepted industry standards.<br />

5. Work shall be checked as it progresses, but failure to detect any defective work or materials shall in no way<br />

prevent later rejection if defective work or materials are discovered, nor shall it obligate Owner to accept<br />

such work.<br />

B. Applicable Sections: Testing by the Owner’s Construction Testing Laboratory is summarized in the following<br />

CTL Testing and Inspection Program Summary Schedule. Refer to the applicable individual sections for specific<br />

details. The Schedule provides summary information only and does not preclude or supersede requirements<br />

contained in the individual sections.<br />

CTL Testing and Inspection Program<br />

Summary Schedule<br />

Section & Title<br />

Description of Test or Observation<br />

Type of<br />

Inspector<br />

Report<br />

Frequency<br />

02320 - Excavating,<br />

Backfilling, and<br />

Compacting<br />

03312 - Cast-In-Place<br />

Concrete Slabs<br />

(Interior)<br />

03362 – Burnished<br />

Concrete Floor Finishes<br />

03367 – Color<br />

Densification (Existing<br />

Integrally Colored<br />

Tests: Classification of Materials,<br />

Laboratory Testing, Field Density Tests<br />

Obversation: Subgrades/excavation<br />

bases, bearing capacity, presence of<br />

groundwater.<br />

Testing: Lab test, field tests<br />

Inspection: Forms, slabs, reinforcement,<br />

conc. mix, placement, curing, embedded<br />

items, hardener/densifier<br />

Testing: Gloss measurement, slip<br />

resistance measurement.<br />

Testing: Gloss measurement, slip<br />

resistance measurement.<br />

TI, TII, or TIII<br />

as specified<br />

TI, TII, or StI<br />

as specified<br />

TI<br />

TI<br />

Per test/observation<br />

Same<br />

Same<br />

Weekly<br />

01458-6<br />

<strong>Walmart</strong> #<strong>1186</strong> – <strong>Liberty</strong>, <strong>TX</strong> 04/20/11<br />

CMA/10118.034

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!