3. Prevention of stored materials in exposed sales floor areas until completion of construction.<br />

4. When and how floor covering protection will be provided in high traffic areas.<br />

5. Condition, inspection, and operational procedures for construction equipment allowed on the slab surface,<br />

including but not limited to:<br />

a. Diapering to contain any potential fluid leaks.<br />

b. Use of non-marking tires<br />

c. Inspection of tire treads for any debris that may mar the slab surface.<br />

6. Procedures for cleaning up slab spills, including use of and availability of cleaning chemicals and<br />

absorptive materials at the site.<br />

B. Slab Protection:<br />

1. Protect finished floors to prevent damage by construction traffic and activities until Owner possession.<br />

2. Protect concrete slabs from staining, gouges and scratching.<br />

3. Diaper hydraulic powered equipment.<br />

4. Place drop cloths or other breathable slab protection under parked vehicles.<br />

5. Do not store structural steel or metal fabrications on slab.<br />

6. Do not allow pipe cutting machine on slab.<br />

7. Adequately protect concrete inserts and other embedded items from movement, mechanical injury, or from<br />

damage by elements.<br />

8. Provide access ramps of compacted earth or other means along exposed concrete edges of floor slabs to<br />

prevent equipment and machinery from impacting edges. Barricade all other exposed edges to vehicular<br />

traffic which may damage edges.<br />

C. Traffic protect curing compound floor surfaces as follows:<br />

1. Barricade concrete surfaces immediately after placing and finishing.<br />

2. 3 full days (72 hours) after placement: Slab shall be open for normal store operations.<br />

3. 7 full days (168 hours) after placement: Heavy loading permitted but not before concrete has obtained, by<br />

test, its design strength as noted herein. Approved 7 day compressive strength test report from Construction<br />

Testing Laboratory must be received by Wal-Mart Construction Manager prior to allowing heavy loading<br />

on slab.<br />

D. Provide daily scrubbing, using only water, of the entire surface of exposed concrete slab placed under this<br />

Specification with fuel powered riding equipment from time concrete has reached, by test, its design strength prior<br />

to initial application of surface densifier as specified in Section 03362.<br />

END OF SECTION<br />

03312-26<br />

<strong>Walmart</strong> #<strong>1186</strong> – <strong>Liberty</strong>, <strong>TX</strong> 04/20/11<br />

CMA/10118.034