F. Report:<br />

1. Provide report (MS Word format) of drains and pipes tested and defects noted. Include the following:<br />

a. <strong>Store</strong> number and location.<br />

b. Name of General Contractor.<br />

c. Name of plumbing Contractor and dye testing Contractor.<br />

d. Test date.<br />

e. Documentation of dye test activities and irregular occurances as required above.<br />

f. Plan of piping network tested. Indicate layout and size of each line tested and the point of discharge<br />

to the sanitary sewer or other location.<br />

2. Furnish one copy of the report to the Wal-Mart Construction Manager within one week after completion of<br />

the test procedure.<br />

3.9 UNDERGROUND PIPING VIDEO INSPECTION (AT THE DISCRETION OF THE WAL-MART<br />

CONSTRUCTION MANAGER)<br />

A. General: Perform video inspection of new underground sewer piping both outside the building through the mains<br />

and inside the building and through the single takeoff to each fixture.<br />

B. When there are problems with existing sewer piping, perform video inspection of existing sewer piping and<br />

coordinate repair of deficiencies with Wal-Mart Construction Manager. An equitable adjustment will be made in<br />

the contract price for additional work directed and performed.<br />

C. Contractor Qualifications: Inspection shall be conducted by a Contractor who has at least 2 years experience in the<br />

specific work involved.<br />

D. Certification: Provide statement of certification of the following:<br />

1. Verification of video inspection contractor qualifications.<br />

2. Statement of completion that the work is in accordance with the specified requirements.<br />

3. Name and signature of the General Contractor.<br />

4. Names and signatures of the video inspection subcontractor.<br />

E. Video Taping Requirements:<br />

1. Video camera designed for express purpose of sewer line inspection.<br />

2. Camera and apparatus capable of extending to all points of piping required within 2 inch to 8 inch diameter<br />

pipe.<br />

3. Video taping with recording on-screen distance counter.<br />

4. Taping shall include expert narrative of situations encountered which may be associated with improper<br />

installation or operation of the sewer. Audio commentary shall include time and date, location description<br />

in an on-to-from format, size of sewer, direction of flow, and video tape identification number.<br />

5. Taping shall produce clear, sharp, images in VHS or CD-ROM format.<br />

6. Tape shall identify date, time, and precise location of taping operations. Tape shall reveal evidence of<br />

surrounding area around each entry point.<br />

F. Procedure:<br />

1. Inspect sewer pipes with video camera no earlier than 30 days after floor slab has been poured. Sections of<br />

sewer determined to be deficient shall be uncovered and repaired or replaced to satisfaction of Owner.<br />

Retest repaired section.<br />

2. Adequately flush and clean sewer piping prior to video inspection.<br />

3. Provide additional video inspection at Contractor's expense if there are clogging problems within the first<br />

year warranty and if requested by Owner.<br />

15100-10<br />

<strong>Walmart</strong> #<strong>1186</strong> - <strong>Liberty</strong>, <strong>TX</strong> 04/20/11<br />