E. Continue burnishing operations until the specified gloss is attained. Achieve specified gloss no later than two<br />
weeks prior to Re-Grand Opening and maintain specified gloss until Re-Grand Opening.<br />
F. Provide final burnishing prior to Grand Opening as required to eliminate damage from subsequent work.<br />
3.5 FINISH REQUIREMENTS<br />
A. Gloss: Final surface gloss shall be a Specified Overall Gloss Value (SOGV) of not less than 40 and a Minimum<br />
Local Gloss Value (MLGV) of 30 as measured using a Horiba IG-320 Gloss Checker.<br />
B. Slip Resistance: Measured static coefficient of friction (SCOF) shall be not less than 0.50 at time of Re-Grand<br />
Opening as measured using an American Slip Meter ASM 825 Digital Meter, Regan Scientific Instruments BOT-<br />
3000 Tribometer, or approved equal.<br />
3.6 PROTECTION<br />
A. Protect areas to receive polished concrete finish at all times during construction to prevent oils, dirt, metal, excessive<br />
water, paint and other potentially damaging materials from affecting the finished concrete surface. Protective<br />
measures listed below shall begin immediately after completion of polishing.<br />
1. Communicate to all subcontractors, vendors, and trades importance of maintaining slab protection at all<br />
times.<br />
2. Protect slab surface from moisture for 72 hours to prevent re-emulsification of protective surface treatment<br />
prior to cure. Verify that all wood pallets are dry prior to replacing.<br />
3. Each day, inspect all equipment used over completed slab surface, to insure:<br />
a. Equipment is without leaking hydraulic lines and is diapered to avoid staining. Remove all equipment<br />
with hydraulic fluid leaks from store site.<br />
b. <strong>No</strong> tire embedments (rocks, nails, screws, etc.) that will scratch or pit slab surface.<br />
4. Prevent contact with acids and acidic detergents.<br />
5. Use breathable surface protective materials for high traffic areas.<br />
a. EZ-Cover, by McTech Group, (866) 913-8363.<br />
b. Ram Board, by Ram Board, (818) 848-0400.<br />
6. Use breathable drop cloths during all painting. Immediately wipe clean spilled paint.<br />
3.7 QUALITY ASSURANCE TESTING<br />
A. Testing will be performed by the Wal-Mart Construction Testing Laboratory (CTL) at no expense to the Contractor.<br />
A test report of all measurements and a plan and table of the measurements taken shall be prepared by the<br />
CTL for submittal.<br />
B. General Contractor shall notify CTL when slab is ready for testing.<br />
C. Take gloss measurements once weekly. Gloss shall be considered as a quantitative value that expresses the degree<br />
of reflection when light hits the concrete floor surface. Gloss measurements will be taken independent of ambient<br />
lighting and within a sealed measurement window located beneath the testing equipment. Measurement and reporting<br />
of SOGV and MLGV by CTL shall be as follows:<br />
1. Collect a minimum of five samples per each bay, in random, evenly distributed locations. Record measurement<br />
locations on copy of Floor Burnishing Plan. Discard the high and low values measured in each<br />
bay.<br />
2. The average of all samples collected in each bay shall meet SOGV.<br />
a. If the average of samples collected do not meet the SOGV, collect an additional 3 samples in each<br />
bay for each deficient result unless the individual samples fail to meet the MLGV or the average of<br />
all collected samples in each bay fail to meet the SOGV.<br />
b. If samples fail to meet the SOGV, Contractor shall continue burnishing until the SOGV is achieved.<br />
3. <strong>No</strong> single measured value shall be less than MLGV.<br />