CONCRETE SUBMITTAL REGISTER<br />

SUBMITTAL SUBMIT TO SUBMITTAL DUE<br />

Concrete Contractor Qualifications Letters Architect<br />

30 days prior to first pour<br />

• Qualification Statement<br />

• 3 ACI Finisher Certifications<br />

Concrete Batch Plant Quality Certification Architect<br />

30 days prior to first pour<br />

• NRMCA Certification<br />

• DOT Certification<br />

Sieve Analysis for Aggregate Base System Architect (by email)<br />

30 days after award of<br />

• Aggregate Base Material<br />

Wal-Mart Construction<br />

Contract.<br />

• Choker Material<br />

Testing Laboratory (CTL)<br />

Concrete Mix Design<br />

• One mix for all interior slabs<br />

• Submit on form provided<br />

• Required Attachments<br />

Product Data<br />

• Dowels at construction joints.<br />

• Dowels at sawed joints (if specified)<br />

• Vapor retarder (if specified)<br />

• Curing compound<br />

Slab Jointing and Placement Plan<br />

• Placement sizes / sequencing<br />

• Joint Types and Locations<br />

• Designate Test Slab location<br />

Interior Slab Reinforcing (if specified)<br />

• Perimeter foundation tie reinforcing<br />

submittals are submitted under Section<br />

03310.<br />

Pre-slab Installation Meeting<br />

• Record of notification<br />

(schedule with SSI)<br />

• Meeting agenda<br />

• Meeting minutes<br />

(by email)<br />

Architect (by email)<br />

Wal-Mart Construction<br />

Testing Laboratory (CTL)<br />

(by email)<br />

Architect<br />

Wal-Mart Construction<br />

Testing Laboratory (CTL)<br />

Architect<br />

Wal-Mart Construction<br />

Testing Laboratory (CTL)<br />

Architect<br />

Wal-Mart Construction<br />

Testing Laboratory (CTL)<br />

SSI<br />

Wal-Mart Construction<br />

Manager<br />

Wal-Mart Construction<br />

Testing Laboratory (CTL)<br />

30 days prior to first pour<br />

30 days prior to first pour<br />

30 days prior to first pour<br />

30 days prior to first pour<br />

3 days after meeting.<br />

Statement of Acceptance of Concrete Supplier SSI At or prior to Pre-slab<br />

meeting.<br />

Delivery Tickets<br />

Wal-Mart Construction<br />

With delivery of each load<br />

Testing Laboratory (CTL)<br />

Closeout Submittals See Section 01770 See Section 01770<br />

03312-31<br />

<strong>Walmart</strong> #<strong>1186</strong> – <strong>Liberty</strong>, <strong>TX</strong> 04/20/11<br />

CMA/10118.034

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!