06.09.2015 Views

PROJECT MANUAL Specifications Seafood Removal Walmart Store No 1186 Liberty TX

Specs - Home

Specs - Home

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A. Unless otherwise modified by the reclamation program guidelines, products not acceptable for reclamation include:<br />

1. Tile or adhesive containing asbestos.<br />

2. Skid resistant tile.<br />

3. Tan colored tile.<br />

4. Red colored tile.<br />

5. Dark colored tile. Coordinate with <strong>Walmart</strong> <strong>Store</strong> Planning Field Project Manager to contact Reclamation<br />

firm for specific acceptable colors.<br />

6. PVC plank (wood look) tile.<br />

B. Bulk removed tile containing foreign material or debris will not be acceptable.<br />

C. Tile or adhesive suspected to contain asbestos shall be tested for asbestos presence prior to reclamation.<br />

D. Unacceptable VCT shall be disposed of as specified in Section 02023.<br />

PART 3 - EXECUTION<br />

3.1 EXAMINATION<br />

A. Survey and assess the quantity of acceptable VCT to be removed. Quantities considered to be less than full truckloads<br />

shall not be reclaimed with respect to this program but shall be disposed of by the Contractor in accordance<br />

with Section 01742.<br />

3.2 COORDINATION AND APPROVAL<br />

A. The Contractor shall coordinate the precise details and execution of the reclamation program with the Wal-Mart<br />

<strong>Store</strong> Planning Field Project Manager.<br />

B. Verify that the old VCT tiles can be recycled.<br />

C. Reclamation by the Contractor is mandatory for VCT which is acceptable under the terms of the reclamation program.<br />

3.3 VCT REMOVAL<br />

A. Sweep all debris from VCT surfaces. Remove excessive buildup of wax and other debris.<br />

B. Remove VCT to be reclaimed. Tile may be removed using normal removal methods.<br />

3.4 LOADING AND SHIPPING<br />

A. Wal-Mart’s reclamation firm will provide tile reclamation bags suitable for placement on pallets. Contact the<br />

Wal-Mart <strong>Store</strong> Planning Field Project Manager for provision of bags.<br />

B. VCT shall be prepared for shipment in accordance with the reclamation program guidelines and instructions. Preparation<br />

shall be in strict accordance with the guidelines provided and shall take precedence over any conflicting<br />

provisions stated herein. Contact Wal-Mart <strong>Store</strong> Planning Field Project Manager for coordination of preparation<br />

and to obtain specific loading and shipping instruction prior to removal of VCT.<br />

C. Fill tile reclamation bags with VCT that is acceptable for reclamation to the maximum fill line indicated.<br />

D. Place properly prepared tile reclamation bags on pallets and store in a dry location.<br />

02223-2<br />

<strong>Walmart</strong> #<strong>1186</strong> – <strong>Liberty</strong>, <strong>TX</strong><br />

CMA/10118.034 04/20/11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!