C. Floor Burnishing Plan:<br />

1. Prior to commencement of work, furnish floor burnishing plan to identify sequential progression of work,<br />

including:<br />

a. Size of individual nightly work areas<br />

b. Electrical supply locations, including exterior access if generators are utilized<br />

c. Unique work requirement locations (i.e. joint repairs, floor patching, etc.)<br />

d. Anticipated start and finish date of work<br />

D. Plan shall be reviewed and accepted by Wal-Mart Construction Manager and Wal-Mart Field Project Manager<br />

prior to start of slab enhancement work.<br />

E. Test Results:<br />

1. Submit finished floor gloss test results and slip resistance produced by the CTL to the Wal-Mart Construction<br />

Manager and Wal-Mart’s Concrete Consultant.<br />

F. Closeout:<br />

1. Verification of gallons used of densifier and stain guard for application.<br />

1.4 PRODUCT DELIVERY, STORAGE AND HANDLING<br />

A. Dispense surface densifier and stain guard material from factory numbered and sealed packages. Maintain record<br />

of numbered packages.<br />

1.5 QUALITY ASSURANCE<br />

A. Test area:<br />

1. Clean, prepare, apply densifier and stain guard to a 200 square foot sample area located as directed by the<br />

Wal-Mart Construction Manager. Burnish to specified gloss values.<br />

2. Joint edge and vertical abutment conditions should be included in sample area.<br />

3. Completed test installation must be approved by Wal-Mart Construction Manager prior to continuation of<br />

main slab work.<br />

4. Approved sample area will become part of the completed work.<br />

B. Environmental Requirements:<br />

1. Limit and control all noise, dust and moisture created by concrete surface enhancement work to meet all local,<br />

state, and Federal ordinances, codes and laws.<br />

2. Comply with lithium stain guard manufacturer’s written instructions for substrate temperature and moisture<br />

content, ambient temperature and humidity, ventilation and other conditions affecting chemical performance.<br />

3. Application of lithium stain guard shall be coordinated with Wal-Mart Construction Manager and Wal-<br />

Mart Field Project Manager to ensure no foot traffic prior to drying.<br />

C. <strong>Walmart</strong> Concrete Consultant:<br />

1. Structural Services, Inc. (SSI), (214) 522-6438.<br />

D. Mock Up: Prior to commencement of main slab work, prepare mock up for evaluation of surface preparation techniques,<br />

ability of slab to accept specified products and procedures, and application workmanship.<br />

1. Designate 200 square feet for mock up of system specified, using same materials, tools, equipment, and<br />

procedures intended for actual surface preparation in Sales floor at location determined by the Wal-Mart<br />

Construction Manager. Include properly prepared slab joints, surface spalls and crack repairs if available.<br />

Include slab edges adjoining existing partitions/walls.<br />

2. <strong>No</strong>tify <strong>Walmart</strong> Construction Manager minimum 14 days prior to date and time when mockups will be performed<br />

and completed.<br />

03931-2<br />

<strong>Walmart</strong> #<strong>1186</strong> – <strong>Liberty</strong>, <strong>TX</strong> 04/20/11<br />

CMA/10118.034

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!