06.09.2015 Views

PROJECT MANUAL Specifications Seafood Removal Walmart Store No 1186 Liberty TX

Specs - Home

Specs - Home

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

a. Elastomeric Membrane Roofing (Section 07530). Include the following:<br />

1) Roof Inspection Checklist.<br />

2) Periodic site inspection reports.<br />

3) Site Inspection Certificate.<br />

b. Paints and Coatings. (Section 09900) Elastomeric Coating.<br />

c. Vehicle Service Equipment Systems. (Section 11140)<br />

1) Testing and Inspection Reports.<br />

d. Loading Dock Equipment. (Section 11160)<br />

1) Certificate of Inspection.<br />

e. Energy Management Systems: (Section 13810)<br />

1) Pre-Checkout Forms.<br />

2) Checkout Forms.<br />

f. Building Services Piping: (Section 15100)<br />

1) Video Inspection Report.<br />

2) Dye Testing Report.<br />

g. Refrigeration Equipment (Section 15600).<br />

1) Start-up Report.<br />

2) Documents will be distributed by <strong>Walmart</strong> Mechanical Services.<br />

15. Copy of <strong>No</strong>tice of Termination of NPDES Construction General Permit with proof of submittal to<br />

appropriate agency. This is only applicable for those permits issued to the General Contractor. (See Section<br />

02370).<br />

1.5 RECORD LETTERS OF CONFORMANCE<br />

A. Submit Record Letters of Conformance as a Closeout Submittal. By submitting Record Letter of Conformance, the<br />

Contractor declares that the product identified by manufacturer's name and model number is the product specified<br />

and is suitable for the intended use as defined within the Contract Documents and has been provided and placed in<br />

operational condition in accordance with the manufacturer's published instructions and the Contract Documents.<br />

1. Submit completed Record Letter of Conformance for each product selected as indicated within each<br />

Section.<br />

2. Fill-in required information on form and sign in ink by person authorized to sign on behalf of the<br />

Contractor.<br />

3. <strong>No</strong> modifications shall be made to the form.<br />

4. Record Letters of Conformance, when required, are located at the end of the respective Section.<br />

1.6 LETTERS OF CERTIFICATIONS<br />

A. Certify manufacturer's or installer's qualifications, conformance with tests or specified criteria, or other factors as<br />

required in individual specification sections.<br />

B. Submit supporting reference data, affidavits, and certifications as required.<br />

C. Number of Copies Required: Two.<br />

1.7 <strong>PROJECT</strong> RECORD DOCUMENTS:<br />

A. Maintain on site, one set of the following record documents. Record actual revisions to the Work.<br />

1. Contract Drawings. (Building and Civil)<br />

2. <strong>Specifications</strong>.<br />

3. Addenda.<br />

4. Change Orders and other Modifications to the Contract.<br />

5. Reviewed shop drawings, product data, and samples.<br />

B. Maintain Record Documents separate from documents used for construction.<br />

01770-3<br />

<strong>Walmart</strong> #<strong>1186</strong> – <strong>Liberty</strong>, <strong>TX</strong> 04/20/11<br />

CMA/10118.034

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!