PROJECT MANUAL Specifications Seafood Removal Walmart Store No 1186 Liberty TX
Specs - Home
Specs - Home
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
UniSpec II-<strong>Store</strong> Planning 013007<br />
SECTION 02320 - EXCAVATING, BACKFILLING, AND COMPACTING<br />
PART 1 - GENERAL<br />
1.1 SUMMARY<br />
A. Section Includes:<br />
1. Trenching and backfilling for utilities.<br />
B. Related Sections<br />
1. Division 3 – Subbase requirements for granular subbase below building slabs.<br />
1.2 REFERENCES<br />
A. The publications listed below form a part of this specification to the extent referenced. Publications are referenced<br />
within the text by the basic designation only.<br />
B. ASTM International (ASTM)<br />
1. ASTM D 422 - Standard Test Method For Particle Size Analysis of Soil<br />
2. ASTM D 698 - Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft 3 (600<br />
kN.m/m 3 ))<br />
3. ASTM D 1557 - Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft 3<br />
(2,700 Kn.m/m 3 ))<br />
4. ASTM D 2321 - Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and<br />
Other Gravity-Flow Applications.<br />
5. ASTM D 2922 - Density of Soil and Soil-Aggregate In Place by Nuclear Methods (Shallow Depth)<br />
6. ASTM D 4318 - Liquid Limit, Plastic Limit, and Plasticity Index of Soils<br />
C. American Association of State Highway and Transportation Officials (AASHTO)<br />
1. AASHTO T 88 - Particle Size Analysis of Soils<br />
D. National Fire Protection Association (NFPA)<br />
1. NFPA 70 - National Electrical Code<br />
E. American Water Works Association (AWWA)<br />
1. AWWA C200 - Standard For Steel Water Pipe - 6 In. (150 Mm) And Larger<br />
2. AWWA C206 - Field Welding Of Steel Water Pipe<br />
1.3 QUALITY ASSURANCE<br />
A. An Independent Testing Laboratory (ITL), selected and paid for by the Owner, will be retained to perform<br />
construction testing on site.<br />
1. The ITL shall prepare test reports that indicate test location, elevation data, and test results. Owner, Civil<br />
Engineering Consultant, and Contractor shall be provided with copies of reports within 96 hours of time<br />
that test was performed. In event that test performed fails to meet <strong>Specifications</strong>, the independent testing<br />
laboratory shall notify Owner and Contractor immediately.<br />
2. Costs related to retesting due to failures shall be paid for by the Contractor at no additional expense to<br />
Owner. Contractor shall provide free access to site for testing activities.<br />
3. Quality assurance testing will be conducted in accordance with Paragraph “Field Testing” in Part 3<br />
hereinafter.<br />
02320-1<br />
<strong>Walmart</strong> #<strong>1186</strong> – <strong>Liberty</strong>, <strong>TX</strong> 04/20/11<br />
CMA/10118.034