RESERVOIR APPLICATION FLUIDS<br />

• 0.94 bbl of brine (no KCl)<br />

• 1 gal/100 bbls X-CIDE 102 (25% by volume glutaraldehyde)<br />

2. Optional Barrel Formulation:<br />

• W-306 (5 or 55 gallon) @ 2.00 gpb to YP= 20<br />

• 1 MIL-CARB (50 lb bag)<br />

• 2 to 3 ppb Magnesium Oxide to buffer pH = 8.0<br />

• Brine volume to 1 bbl<br />

• 1 gal/100 bbls X-CIDE 102 (25% by volume glutaraldehyde)<br />

Displacement<br />

Prior to building or loading the PERFFLOW system, all pits and lines should be cleaned and<br />

flushed with water/seawater. Cement and float equipment should be drilled with the existing fluid<br />

prior to displacing the hole with PERFFLOW. Best results can be achieved if the hole can be<br />

circulated with seawater prior to the PERFFLOW displacement. The circulating rate should be as<br />

high as possible with pipe rotation to minimize channeling. Pump a 25 to 30 barrel caustic pill<br />

followed by a 25 to 30 barrel high viscosity (3 gal/bbl W-306) pill then follow with the<br />

PERFFLOW system.<br />

Open Hole Displacement for Completion<br />

At total depth, a short trip to the casing should be made and a high viscosity 25 barrel pill pumped<br />

and circulated to surface. The drilling assembly should be pulled out of the hole and a hole opener<br />

picked up and washed to bottom. The hole and casing can be displaced with a filtered completion<br />

fluid at this time. A 20 barrel pill with 3.0 gallons per barrel W-306 in water should be pumped to<br />

separate the two fluids. If any tight hole was experienced or concern for lost circulation exists, a<br />

PERFFLOW polymer pill (W-306 without calcium carbonate) can be spotted to cover the open<br />

hole plus 500 ft inside the casing. In this case, the workstring should be pulled 250 ft inside the<br />

casing. The casing is then circulated until clean brine is returned to the surface. Pull the hole opener<br />

out of the hole, then rig up and run in the hole with the completion assembly.<br />

General Guidelines<br />

• The pH should be controlled from 8.0 to 9.0.<br />

• All solids control equipment should be run while drilling cement. Sodium bicarbonate will<br />

aid in lowering the pH and will precipitate soluble calcium. Pre-treat the active fluid<br />

system with 1 ppb of Sodium bicarbonate before drilling cement.<br />

• High viscosity sweeps will be used throughout the operation. These sweeps should have a<br />

yield point greater than 50. All sweeps should be at least 100 barrels to increase their<br />

effectiveness.<br />

• Wiper trips are an important tool in gauging hole conditions. A wiper trip at least every 500 ft<br />

can detect a build-up of pressure identified by swabbing.<br />

• Packing fraction refers to that state when a fluid begins to exhibit semi-plastic tendencies due<br />

to solids. For example, the packing fraction of bentonite in freshwater is approximately 5%<br />

<strong>BAKER</strong> <strong>HUGHES</strong> DRILLING FLUIDS<br />

REFERENCE MANUAL<br />

REVISION 2006 6-24