15.03.2018 Views

BAKER HUGHES - Drilling Fluids Reference Manual

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FLUIDS ENVIRONMENTAL SERVICES<br />

OPERATOR<br />

Brunei shell petroleum<br />

CONTRACTOR<br />

Ensco<br />

DATE<br />

04/05/04<br />

OPERATOR REP(S)<br />

MR JIMMY RIDDLE<br />

CONTRACTOR REP<br />

MRS JIMMY RIDDLE REPORT NUMBER<br />

2<br />

ADDRESS<br />

Sunny street KB<br />

RIG<br />

Ensco 51<br />

WATER DEPTH (ft)<br />

60<br />

WELL NAME<br />

FA-12 12<br />

PROJECT / PLATFORM<br />

0<br />

BLOCK<br />

38270<br />

CURRENT ACTIVITY<br />

DRILLING 12.5" HOLE<br />

FIELD<br />

Fairley<br />

Well Information<br />

HSE<br />

WELL PERFORMANCE<br />

Bit Diameter ( in ) 12 1/2<br />

Actual Target Actual<br />

Target<br />

Start Depth ( m ) 1072<br />

LTI (FES)<br />

1 0 NPT FES<br />

2.08%<br />

0.00%<br />

End Depth ( m ) 1572<br />

Spills (FES)<br />

1 0 FES Cost / m<br />

$8.22<br />

$0.00<br />

Drilled ( m ) 500<br />

Man Hours (FES)<br />

120 0 OBM Lost on SCE (m3)<br />

41.59<br />

0.00<br />

Average ROP (m/hr) 22<br />

STOP CARDS<br />

13 0 m3 OBM lost/1 K m drilled<br />

36.20<br />

0.00<br />

Retention On Cuttings (g/kg)<br />

AVERAGE FOR ALL SCE Interval 1 Interval 2 Interval 3<br />

OIL ON CUTTINGS ( % by Weight)<br />

g/kg per Sampling Interval 13.00 17.00 18.00<br />

Mass Balance Interval 1 ROC % (g/kg)<br />

Mass Balance Interval 2 ROC % (g/kg)<br />

SHAKERS ONLY Interval 1 Interval 2 Interval 3<br />

ROC % Benchmark (g/kg)<br />

Mass Balance Interval 3 ROC % (g/kg)<br />

g/kg per Sampling Interval 120.00 125.99 126.67<br />

Well Average ROC (%BF Well)<br />

Daily ROC (g/kg)<br />

Well ROC (g/kg) Ave. Benchmark<br />

16.00 0.00<br />

124.22<br />

21<br />

Base Oil Discharged Daily Cumulative<br />

B.O Discharged-Shakers (m³)<br />

24.13 39.59<br />

B.O Discharged-Dryer (m³)<br />

9.00 -<br />

18<br />

B.O Discharged- Dryer Centrifuge (m³)<br />

90.00 1.00<br />

B.O Discharged-Active Centrifuge (m³)<br />

2.00 1.00<br />

TOTAL B.O Discharged-SCE (m³)<br />

125.13 41.59<br />

15<br />

Fluid Type Daily Cum.<br />

OBM-Shaker Discharge - 5.23 -<br />

% Shaker Discharge To Sea -<br />

OBM-Dryer Discharge petrofree 15.00 3.00<br />

Centrifuge (Dryer) Discharge petrofree 4.00 45.00<br />

Centrifuge (Active) Discharge petrofree 2.00 1.00<br />

OBM Losses Other petrofree - 0.00<br />

OBM Spill (Overboard) petrofree 1.00 1.00<br />

Trip Losses - - -<br />

Total OBM Fluid Discharged petrofree 27.23 50.00<br />

WBM Fluid - 0.00 0.00<br />

Completion Fluid - 0.00 0.00<br />

0<br />

Spacers - 0.00 0.00<br />

0 1 Days<br />

2 3<br />

Waste Wash Water - 0.00 0.00<br />

Solids Discharged (kg)<br />

FES Cost ($)<br />

OBM Cuttings<br />

Daily<br />

Daily Cum. Daily Cum. Cum.<br />

FES Supervisor<br />

Discharged (Shakers) 114622 341890 550.00<br />

$ 1,100.00<br />

$<br />

Third Party Solids Control Cost 750.00 $<br />

$ 770.00<br />

Discharged (Dryer) 137 411 Solids control Equip. $ 1,665.00 $ 3,330.00 Rig Cleaning $<br />

10.00 $<br />

20.00<br />

Discharged (Dryer Centrifuge) 200 400 Solids cont. personnel $ 450.00 $ 900.00 Transportation $<br />

10.00 $<br />

20.00<br />

Solids Discharged (Active Centrifuge) 1 2 Rig up/Rig Down $ 200.00 $ 300.00 <strong>Fluids</strong> Disposal $<br />

10.00 $<br />

20.00<br />

WBM Cuttings<br />

<strong>Fluids</strong> Discharged To Sea<br />

Shaker Screens $ 200.00 $ 300.00<br />

Total<br />

Benchmark<br />

Daily Cum. Shaker Screens Repair 200.00<br />

$ 300.00<br />

$<br />

5,217.00 $<br />

$ Cumulative <strong>Drilling</strong> fluid Cost -<br />

Generated 0.00 0.00 Cuttings Handling $ 10.00 $ 20.00 Cum. BHI Cost $<br />

7,120.00 $<br />

-<br />

Discharged to Sea - 0.00 Cuttings Disposal<br />

$ 10.00 $ 20.00 FES Cost<br />

$<br />

12,337.00 $<br />

-<br />

Disposed (Shipped to Shore) Overboard - 0.00<br />

OBM<br />

WBM<br />

Completion<br />

Spacers<br />

Fluid discharged to Sea<br />

Fluid<br />

Down hole losses (<strong>Drilling</strong>)<br />

Fluid left behind casing<br />

Evaporation Losses<br />

OBM VOLUME ANALYSIS (m³)<br />

Unscheduled Discharges (See Comments)<br />

Fluid Recovered (m³)<br />

TOTAL<br />

SOLIDS CONTROL INFORMATION<br />

Type Daily Cum.<br />

petrofree 2.00 1.00<br />

0.00 - 0.00<br />

0.00 - 0.00<br />

Spacers - 0.00<br />

Daily<br />

Cum.<br />

0.00 0.00<br />

0.00 0.00<br />

0.00 0.00<br />

0.00 0.00<br />

0.00 0.00<br />

0.00 0.00<br />

Centrifuge Data Cent. 1 Cent. 2 Cent. 3 Dryer<br />

Equipment Type/Model DE-1000 DE-1000 DE-1000 J S 110<br />

Bowl Speed 4000 4000 4000 300<br />

Back Drive Speed 3000 3000<br />

3000 -<br />

Feed Rate 302.83 302.83<br />

302.83 1000<br />

Weight In 12.8 12.8<br />

12.8 15.3<br />

Weight Out 12.2 12.2<br />

12.2 12<br />

Discharge Weight 0.6 0.6<br />

0.6 3<br />

Hours Run 2 2<br />

8 24<br />

Down Time (hrs) 0 0 0 0<br />

Utilisation (%) 100.0 100.0 100.0 100.0<br />

SHAKER(S) DATA 1 2 3 4 5 6<br />

Equipment Type/Model VSM100 VSM100 VSM100 VSM100 VSM100 VSM100<br />

Screen Type / Size 165X4 165X4 165X4 165X4 165X4 165X4<br />

Screen Changes 4 4 4 4 4 4<br />

Repair Screen Change 4 4 4 4 4 4<br />

Weight in 12.2 12.2 12.2 12.2 12.2 12.2<br />

Weight out 12.2 12.2 12.2 12.2 12.2 12.2<br />

Discard Weight 12.2 12.2 12.2 12.2 12.2 12.2<br />

Hours Run 24 24 24 24 24 24<br />

Down Time (hrs) 0 0 0 0 0<br />

0<br />

Utilisation (%) 100.0 100.0 100.0 100.0 100.0 100.0<br />

FES Engineers:<br />

ce: Offi<br />

JASON BODMER MR CHOMPOO<br />

Baker Hughes INTEQ<br />

<strong>Fluids</strong> And Environmental Services Daily Report<br />

Brunei shell petroleum<br />

O.O.C % (by weight)<br />

12<br />

9<br />

6<br />

3<br />

Depth<br />

Total FES Cost, $US<br />

0 200,000 400,000 600,000 800,000 1,000,000<br />

0<br />

500<br />

1,000<br />

1,500<br />

2,000<br />

2,500<br />

3,000<br />

3,500<br />

4,000<br />

BENCHMARK TARGET CUMULATIVE TOTAL FES COST<br />

Comments:<br />

WELL WELL WELL, WHAT DO WE DO NOW<br />

HIGH STREE BRUNEI<br />

Telephone :<br />

666 666 666<br />

Figure 14 - 5 Example of a Daily FES Report<br />

<strong>BAKER</strong> <strong>HUGHES</strong> DRILLING FLUIDS<br />

REFERENCE MANUAL<br />

REVISION 2006 14-16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!