BOREHOLE PROBLEMS<br />

5. Mix for approximately five minutes after addition of last sack. Mix until the material forms a<br />

smooth blend.<br />

6. When MAGNE-SET accelerator is used, it should be added last to the slurry, mixed just enough for<br />

proper dispersion, and pumped downhole in a non-stop operation.<br />

Note: The weight of the blended slurry should be 14.0 lb m /gal to assure optimum<br />

performance. The weight is reduced by adding water and increased by adding MAGNE-SET.<br />

Typical Pumping Procedure<br />

1. If possible, locate the lost circulation zone.<br />

2. Pull drillstring above the lost circulation zone.<br />

3. Pump the MAGNE-SET slurry into the drillpipe.<br />

Note:<br />

Clean the empty tank or pit with water, or flush with fluid from the active system.<br />

4. Using fluid from the drilling fluid system, pump the MAGNE-SET slurry down to the lost<br />

circulation zone. Pump slurry at maximum rate.<br />

5. If required by hole conditions, the MAGNE-SET slurry can be squeezed into the formation using<br />

standard squeeze procedures.<br />

6. P<br />

ull up above the top of the MAGNE-SET slurry.<br />

7. A<br />

llow MAGNE-SET to cure for eight hours, keeping the annulus full if possible.<br />

X-LINK ® SYSTEM<br />

Baker Hughes <strong>Drilling</strong> Fluid’s X-LINK system combines advanced, cross-linking polymers<br />

with bridging agents to provide quick, reliable control of fluid loss. In addition, X-LINK offers a<br />

proven means of controlling the more severe circulation losses resulting from large fractures or<br />

vugular spaces.<br />

X-LINK pills are temperature-activated and setting time is controlled through the addition of<br />

accelerator (X-LINK ® ACR) or retarder (X-LINK ® RTR) during mixing, thereby eliminating<br />

the risk of premature setting at the surface or while pumping through the bottom hole assembly.<br />

Mixing Procedure<br />

The mixing of an X-LINK pill does not require any specialized equipment and can be<br />

accomplished at the rig site. A 40 lb. bag of X-LINK makes one barrel of pill. Set-up time is<br />

controlled by the well’s bottom hole temperature (BHT). It is vital that the well’s temperature<br />

profile be known prior to the X-LINK application. A supplemental retarder is required for use in<br />

wells possessing bottom hole temperatures greater than 150º F (65° C). In addition, an<br />

<strong>BAKER</strong> <strong>HUGHES</strong> DRILLING FLUIDS<br />

REFERENCE MANUAL<br />

REVISION 2006 7-30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!