15.03.2018 Views

BAKER HUGHES - Drilling Fluids Reference Manual

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RESERVOIR APPLICATION FLUIDS<br />

A well-conditioned fluid will be easier to displace from a wellbore. The mud should be circulated<br />

and conditioned at normal flow line temperatures while reducing its viscosity and gels, but not to<br />

the point where it can no longer suspend weight material. When adjusting the rheology, the flow<br />

characteristics of the mud improve, making it easy to circulate and evenly disperse the solids prior<br />

to removal.<br />

Surface Pits and Equipment Clean-up<br />

Attention should be made to ensure the well and / or circulating system is not re-contaminated after<br />

the clean up. It is important that all areas coming into contact with the well are cleaned prior to the<br />

well clean up.<br />

Pit management and cleaning is a critical element for providing clean brine all through the well.<br />

With increasing restriction on pit access and pressure on time, management of pits and cleaning<br />

needs to be carefully considered by the rig team. Draft plan including pumping schedules and pit<br />

requirements must be discussed with all relevant personnel.<br />

Right pit washing tools will reduce the requirement for pit entry and reduce waste generated. The<br />

effectiveness of these systems relies on use of an effective detergent at ambient surface<br />

temperatures. All areas that require cleaning shall be cleaned by circulating a detergent pill for a<br />

minimum of 20 minutes, and then flushed with sea / drill water.<br />

Pit cleaning not only carries HSE risks associated with pit entry and waste volumes generated, poor<br />

cleaning of pits and surface lines can seriously affect clean up efficiency. Effective isolation<br />

between pits is very important to avoid contamination.<br />

The suggested checklist is a guideline for checking out equipment / areas that should be cleaned.<br />

The list has to be adjusted to the actual and relevant equipment on rig.<br />

AREA / EQUIPMENT<br />

Pits – (All where Completion fluid<br />

will be stored)<br />

Sand traps<br />

Degasser<br />

Mud Cleaner<br />

Mud Ditches<br />

Pumps<br />

Header Box<br />

Shakers<br />

Gumbo<br />

Poor Boy<br />

Trip Tank<br />

Trip Tank Fill Line<br />

Trip Tank Overflow Line<br />

Standpipe Manifold<br />

Top Drive<br />

Chicksans<br />

CLEANED<br />

PRIOR TO<br />

PUMPING<br />

CLEANED<br />

DURING<br />

PUMPING<br />

<strong>BAKER</strong> <strong>HUGHES</strong> DRILLING FLUIDS<br />

REFERENCE MANUAL<br />

REVISION 2006 6-91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!