15.03.2018 Views

BAKER HUGHES - Drilling Fluids Reference Manual

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FLUIDS ENVIRONMENTAL SERVICES<br />

Baker Hughes INTEQ <strong>Fluids</strong> Environmental Services<br />

Daily SCE/Waste Management Report<br />

Operator<br />

Contractor<br />

Report Number<br />

Operators Rep<br />

Contractor Rep<br />

Date<br />

Address<br />

Current Activity<br />

Field<br />

Well Name<br />

Rig<br />

Block<br />

Hole Size<br />

inches <strong>Drilling</strong> Hours<br />

Depths (m)<br />

><br />

Shakers<br />

Dryer<br />

Mud Recovered From<br />

Centrifuges<br />

0<br />

typhoon<br />

Dryer<br />

0 0<br />

Top Screen Feed ppg Saved bbls Mode dryer active<br />

Lower Back Returns Saved ppg Bowl RPM<br />

Lower Front gauge hole Saved mT Bowl PSI<br />

Beach mT / day + Oil bbls Diff LPM<br />

Underflow ppg Downtime + Oil ppg Feed GPM<br />

Discharge % + Oil mT Feed ppg<br />

gauge hole Blend bbls Centrate<br />

mT / day Blend ppg Pump Hrs<br />

Downtime Blend mT Downtime<br />

Shaker Retort<br />

Dryer Retort<br />

Mud Recovered From<br />

Centrifuge Retort<br />

0 Sample 1 Sample 2 Sample 3 Dryer Retort<br />

0 0<br />

Average ppg<br />

Average ppg Average ppg Average ppg<br />

LGS mT/day LGS mT/day LGS mT/day LGS mT/day<br />

HGS mT/day HGS mT/day HGS mT/day HGS mT/day<br />

Oil bbls/day<br />

Oil bbls/day Oil bbls/day Oil bbls/day<br />

Mud bbls/day<br />

%ROC (g/kg)<br />

Mud bbls/day %ROC (g/kg)<br />

Mud bbls/day<br />

%ROC (g/kg)<br />

Mud bbls/day<br />

Cake GPM<br />

Centrate GPM<br />

HGS ppb<br />

LGS ppb<br />

%ROC (g/kg)<br />

Solids Control Equipment<br />

Shakers solids feed Dryer Centrifuge (dryer)<br />

Centrifuge (active)<br />

Daily (kg)<br />

liquid feed<br />

Wet Solids<br />

Cumm<br />

0<br />

0 0<br />

solid discharge<br />

Mud<br />

Daily(m3)<br />

Cumm<br />

0 0<br />

0<br />

lost on solids lost on solids lost on solids<br />

Daily(m3)<br />

Base Fluid<br />

Cumm<br />

0<br />

0<br />

0<br />

Hole Size (Inches)<br />

Total<br />

Volumes (m3)<br />

B.F Recovered<br />

Daily<br />

Well<br />

0<br />

Mud Recovered 0<br />

PIT NUMBER<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

Volume Before Cut<br />

Back (m3)<br />

Volume After Cut<br />

Back (m3)<br />

Total<br />

Volume Lost (m3)<br />

Product<br />

Escaid 110<br />

Mil - Bar<br />

Cal. Chloride (95%)<br />

Carbogel<br />

Carbomul HT<br />

Carbotec S<br />

Mil-Lime<br />

Surf-Cote<br />

LC Lube<br />

Mil Carb<br />

Soluflake M<br />

Daily Vol. Discharged<br />

(kg)<br />

Remarks<br />

FES Engineers:<br />

Figure 14 - 4 Example of Daily Solids Control / Waste Management Report<br />

<strong>BAKER</strong> <strong>HUGHES</strong> DRILLING FLUIDS<br />

REFERENCE MANUAL<br />

REVISION 2006 14-15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!