15.03.2018 Views

BAKER HUGHES - Drilling Fluids Reference Manual

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TABLE OF CONTENTS<br />

10000<br />

x<br />

5000<br />

2500<br />

HPLC Water<br />

10 % NaCl<br />

10 % NaCl/30% NF2<br />

20% NaCl<br />

20% NaCl/ 10 % NF2<br />

23% NaCl<br />

23% NaCl/30% HF100<br />

x 10% NaCl/40% NF2<br />

23% NaCl / 30% NF2<br />

1000<br />

**<br />

30 35 40 50 60 70 80 90 100<br />

Temperature (F)<br />

Potential Hydrate Formation<br />

GAS HYDRATES IN THE BOP<br />

** No Hydrate Formation<br />

w/ 23% NaCl / 30% NF2<br />

at 10,000 PSI & 30 F<br />

Hydrates are most likely to form in the choke & kill lines and the BOP, as these are exposed to the<br />

lowest temperature and the highest pressures. The plugging of the well control equipment presents the<br />

greatest hazard potential. In order to prevent hydrate formation during a kick situation a suitable fluid<br />

may be spotted across the BOP and in the choke and kill lines. It is recommended to spot a suitable<br />

fluid across the BOP in the event of a gas kick<br />

Spotting Procedure<br />

1. Close lower-most pipe rams. In this manner, the kill line, BOP stack (above lower pipe rams),<br />

and choke line can be displaced<br />

2. Displace kill line and BOP stack with predetermined strokes. Once the fluid has cleared upper<br />

annular preventers, close preventers, open choke line, and displace same.<br />

3. Close pipe rams above and closest to choke line and begin well killing procedure,<br />

4. After the well is dead, there is potential for trapped gas above the closed pipe rams and below<br />

the annular preventers. A rapid expansion could cause riser collapse.<br />

Procedure For Evacuating Gas From The BOP<br />

1. Close bottom-most pipe rams and annular preventers.<br />

2. Pump mud through the kill line. When this pill returns at the choke line, stop pumping.<br />

3. Allow any gas to evacuate from the stack taking returns to the gas buster.<br />

4. Displace the kill line, BOP stack and choke line with kill weight mud.<br />

5. Open annular preventer, close diverter bag (i.e. diverter lines are open), and displace riser<br />

with kill weight mud.<br />

6. After riser has been circulated with kill mud, open lower pipe rams and check for flow.<br />

<strong>BAKER</strong> <strong>HUGHES</strong> DRILLING FLUIDS<br />

REFERENCE MANUAL<br />

REVISION 2006 13-19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!