29.01.2013 Views

Final Comprehensive Conservation Plan - U.S. Fish and Wildlife ...

Final Comprehensive Conservation Plan - U.S. Fish and Wildlife ...

Final Comprehensive Conservation Plan - U.S. Fish and Wildlife ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Hakalau Forest National <strong>Wildlife</strong> Refuge<br />

<strong>Comprehensive</strong> <strong>Conservation</strong> <strong>Plan</strong><br />

monitoring equipment, solar panels to power unattended monitoring equipment). Some level of<br />

disturbance is expected with these projects, especially if investigator(s) enter areas closed to the<br />

public <strong>and</strong> collect samples or h<strong>and</strong>le wildlife. However, wildlife disturbance (including altered<br />

behavior) will be localized <strong>and</strong> temporary in nature. Where long-term or cumulative unacceptable<br />

effects cannot be avoidable, the project will not be found compatible. Project proposals will be<br />

reviewed by Refuge staff <strong>and</strong> others, as needed, to assess the potential impacts (short, long-term, <strong>and</strong><br />

cumulative) relative to benefits of the investigation to Refuge management issues <strong>and</strong> underst<strong>and</strong>ing<br />

of natural systems. This assessment will form the primary basis for allowing or denying a specific<br />

project.<br />

Public Review <strong>and</strong> Comment:<br />

This determination was issued for public review <strong>and</strong> comment as part of the Hakalau Forest NWR<br />

Draft <strong>Comprehensive</strong> <strong>Conservation</strong> <strong>Plan</strong> <strong>and</strong> Environmental Assessment between August 16, 2010-<br />

September 15, 2010. An open house was held <strong>and</strong> written comments were solicited from the public<br />

during this period for the CCP via news release, website posting, extensive mailing as well as e-mail<br />

list, <strong>and</strong> circulation of <strong>Plan</strong>ning Update 3. No public comment was received on this compatibility<br />

determination.<br />

Determination:<br />

___ Use is Not Compatible<br />

X Use is Compatible with Following Stipulations<br />

Stipulations Necessary to Ensure Compatibility:<br />

Conditions have changed since the original MOA was established. This compatibility determination<br />

establishes a basis for the operation of a field station on the grounds of the Refuge. The uses<br />

described here are conditional upon the development of a new Memor<strong>and</strong>um of Agreement or<br />

Cooperative Agreement that is acceptable under current Refuge System st<strong>and</strong>ards. The previous<br />

MOA expired on October 24, 2009. A current, fully executed MOA must be in place at all times for<br />

this use to be permitted by the Refuge Manager. Any new MOA needs to be revised to include, but<br />

not limited to, the following conditions:<br />

The field station will be operated solely for the purpose of conducting environmental, conservation,<br />

biotic, climatic, <strong>and</strong> management studies that will assist the Service in accomplishing the objectives<br />

for which the Refuge was established.<br />

1. Most of the Refuge is not open to the public, therefore access to the Field Station is restricted<br />

<strong>and</strong> subject to Service approval. Access codes for entry to the Refuge may change from time<br />

to time <strong>and</strong> will be provided by the Refuge as needed. St<strong>and</strong>ard notification for visits<br />

scheduled by permit holders to the Refuge is 7 days from the time of anticipated use. The UH<br />

will maintain a log of visitors to the facility stating name, affiliation, contact information,<br />

vehicle identification information, <strong>and</strong> purpose for the visit, citing relevant SUPs, project or<br />

coordination needs. The Refuge Manager or his /her agent will be provided with this<br />

B-76 Appendix B: Appropriate Uses <strong>and</strong> Compatibility Determinations

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!