29.01.2013 Views

Final Comprehensive Conservation Plan - U.S. Fish and Wildlife ...

Final Comprehensive Conservation Plan - U.S. Fish and Wildlife ...

Final Comprehensive Conservation Plan - U.S. Fish and Wildlife ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Hakalau Forest National <strong>Wildlife</strong> Refuge<br />

<strong>Comprehensive</strong> <strong>Conservation</strong> <strong>Plan</strong><br />

Rank Project Estimated<br />

Cost<br />

19 Rehabilitate 1.16-mile Halfway Road, which provides access to the<br />

midsection of the Upper Maulua Management Unit. The project will provide<br />

all-weather access to facilitate wildlife <strong>and</strong> habitat management efforts such<br />

as fence maintenance, pig control, weed removal, population monitoring,<br />

biological research, <strong>and</strong> tree planting that benefit 15 endangered species.<br />

$ 206,077<br />

20 Rehabilitate 0.3-mile Freddy’s Pond Road, which provides access to the<br />

midsection of the Upper Maulua Management Unit. The project will provide<br />

all-weather access to conduct critical wildlife <strong>and</strong> habitat management efforts<br />

such as fence maintenance, pig control, weed removal, population<br />

monitoring, biological research, <strong>and</strong> tree planting that benefit 15 endangered<br />

species.<br />

$ 54,900<br />

21 Rehabilitate 1.45-mile Bottom Road, which provides access to the midsection<br />

of the Upper Maulua Management Unit. The project will provide all-weather<br />

access to facilitate critical wildlife <strong>and</strong> habitat management efforts such as<br />

fence maintenance, pig control, weed removal, population monitoring,<br />

biological research, <strong>and</strong> tree planting that benefit 15 endangered species.<br />

$ 180,318<br />

22 Rehabilitate 1.01-mile Maulua/Piha Road, which provides access to the<br />

Upper Maulua Management Unit. The project will provide all-weather access<br />

to facilitate critical wildlife <strong>and</strong> habitat management efforts such as fence<br />

maintenance, pig control, weed removal, population monitoring, biological<br />

research, <strong>and</strong> tree planting that benefit 15 endangered species.<br />

Road Improvement Projects<br />

$ 179,430<br />

Condition assessment for Maulua Road (Rte. 100) based upon inventory of<br />

4/21/2004 found the road to be in poor condition. Cost estimate to correct<br />

deficiencies in the 0.41 miles of road.<br />

$ 494,628<br />

Assessment was performed on Asset #10042056 (Pua ‘Ākala Road).<br />

Assessment Documents are located at Regional Office. Material cost was<br />

$524,385. Labor cost was $0. Total item cost was $524,385. Repair total was<br />

$524,385. Assessor notes said FHA condition rating poor.<br />

$ 524,385<br />

FHWA condition assessment for Administrative Access Road (Rte. 102)<br />

based upon inventory of 4/7/2004 found the parking area to be in poor<br />

condition. Cost estimate to correct deficiencies in the 0.34 miles of road.<br />

$ 434,856<br />

Conduct CCA on Asset #10042145 (Hakalau greenhouse loop road).<br />

Assessment was performed on 4/21/2004 <strong>and</strong> Assessment Documents are<br />

located at Regional Office. Material cost was $179,870. Labor cost was $0.<br />

Total item cost was $179,870. Repair total was $179,870. Assessor notes said<br />

FHA condition rating poor.<br />

$ 179,870<br />

Conduct CCA on Asset #10042102 (Pua ‘Ākala cabin road). Assessment was<br />

performed on 4/21/2004 <strong>and</strong> Assessment Documents are located at Regional<br />

Office. Material cost was $243,008. Labor cost was $0. Total item cost was<br />

$24,3008. Repair total was $243,008. Assessor notes said FHA condition<br />

rating poor.<br />

$ 243,008<br />

FHWA condition assessment for Pua ‘Ākala Parking (Rte. 900) based upon<br />

inventory of 4/14/2004 found the parking area to be in fair condition. Cost<br />

estimate to correct deficiencies in the 7,564 sq. ft of parking area.<br />

$ 8,849<br />

C-12 Appendix C. <strong>Plan</strong> Implementation