28.02.2013 Views

Datascope - Mindray

Datascope - Mindray

Datascope - Mindray

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Installation Checkout Procedure Installation Guide<br />

c. Select Continue to prompt to the Normal Screen.<br />

FIGURE 2-12 Compliance Test Results<br />

14. Manual Leak Test<br />

NOTE: The Manual Leak Test detects smaller leaks than can be<br />

detected in the Automatic Leak Test.<br />

a. Ensure that the gas pressure for O 2 , N 2 O, and AIR are at 50 ±10 psi.<br />

b. Power ON the AS3000.<br />

c. Attach a reusable-silicone-rubber breathing circuit to the Breathing System.<br />

NOTE: For testing purposes always use a reusable breathing<br />

circuit.<br />

d. Tightly connect the Y-fitting on the breathing circuit to the test port.<br />

e. Attach a breathing bag to the bag arm.<br />

f. Set the APL Valve to the fully closed position (70 cmH 2 O).<br />

g. Rotate the O 2 Flow Control Valve until 50 cmH 2O pressure is observed on the<br />

Airway Pressure Gauge.<br />

h. Verify that the flow required to stabilize the pressure is less than 300 mL/min.<br />

2 - 16 0070-10-0683 AS3000 Service Manual

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!