01.05.2014 Views

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

10.7 Wairakei Urban Development Comprehensive Storm<strong>water</strong> Consent<br />

The application <strong>for</strong> the Papamoa <strong>catchment</strong> was lodged with Environment BOP in 2006 and is being processed<br />

in conjunction with the Papamoa East (Wairakei) Plan Change. The consent has been granted and appeals are<br />

largely resolved. The application has been required to consider not only the current urban area but the full<br />

urbanization of the Wairakei and Te Tumu areas over the next 50 years.<br />

The key issue has been flood management in a <strong>catchment</strong> with a limited outlet to the ocean. The long term<br />

proposal is a high level outlet to the Kaituna River to be constructed in conjunction with the commencement of<br />

the development of the Te Tumu area around 2021. In order to manage the flooding of the existing rural land<br />

in Te Tumu in the interim, pumping excess <strong>water</strong> to the Kaituna is proposed.<br />

This TEM proposal integrates flood levels set in the Wairakei consent in terms of <strong>storm</strong><strong>water</strong> discharge.<br />

Status: Final Page 106 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!