01.05.2014 Views

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

5. Site Description<br />

The purpose of this report is to assess the effects of a proposed <strong>storm</strong><strong>water</strong> management system <strong>for</strong> the TEM<br />

and the management of flooding across the highway.<br />

5.1 The Locality<br />

The <strong>catchment</strong> area relevant to the project includes the <strong>Mangatawa</strong>, Wairakei and Maranui <strong>catchment</strong>s as<br />

shown in Appendix 3 as drawing 3932036–CK119 Rev F. The <strong>water</strong> generally flows from the <strong>Mangatawa</strong><br />

<strong>catchment</strong> into the harbour, or in spill situations into the Maranui and Wairakei Catchments. As shown on<br />

drawings 3932036-ck073 to 3932036-CK075 (shown in Appendix 4), the area that works will be undertaken<br />

is approximately from chainage 5250 to 10800.<br />

Figure 2: Approximate Location of Proposed Works<br />

Project<br />

Area<br />

Status: Final Page 43 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!