NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

The <strong>water</strong> levels, peak flow rates and velocity <strong>for</strong> the preferred option <strong>for</strong> the 100 year flood are given in the<br />

table below. These have been determined with a hydraulic model of the drainage system.<br />

The following table summarises the 1% AEP results along the Maranui floodway at the <strong>storm</strong><strong>water</strong> treatment<br />

wetland and lower <strong>Mangatawa</strong> drain. The current day to day flows along the <strong>Mangatawa</strong> Drain will remain the<br />

same. The peak rate however can be higher than the present due to the drain capacity improvements.<br />

Table 10: Hydraulic Results 1% AEP<br />

<strong>Mangatawa</strong> Drain<br />

Maranui floodway<br />

Corridor<br />

Peak flow<br />

Peak Water<br />

Peak<br />

Corridor<br />

Peak flow<br />

Peak <strong>water</strong><br />

Peak<br />

width<br />

rate<br />

level (m)<br />

velocity<br />

width<br />

rate<br />

level (m)<br />

velocity<br />

(m)<br />

(m 3 /s)<br />

(m/s)<br />

(m)<br />

(m 3 /s)<br />

(m/s)<br />

Unmitigated<br />

Current situation<br />

Mitigated<br />

Proposed<br />

A - At drain chainage 3,287m<br />

B – At extended culvert outlet<br />

5 17.39 1.82 0.99 24 9.10 1.88 1.45<br />

25 A 46.92 3.03 1.5 12 B 6.51 1.64 1.35<br />

7.1.12 Storm<strong>water</strong> Treatment Wetland<br />

The current Storm<strong>water</strong> Treatment Wetland is owned by TCC and on land leased from MPBI. It is <strong>for</strong> the<br />

treatment of <strong>storm</strong><strong>water</strong> generated from residential areas within the Maranui <strong>catchment</strong>. This project will<br />

maximise the use of this area to treat and discharge <strong>storm</strong><strong>water</strong> generated by the TEM. In addition to this the<br />

wetland will be able to accommodate discharges from the MPBI industrial zoned land at Truman lane, and MPBI<br />

industrially zoned land between Truman Lane and the <strong>Mangatawa</strong> Drain.<br />

The final shape and design of the <strong>storm</strong><strong>water</strong> treatment wetland will be dictated by the developments that are<br />

proposed to use it. In this instance if the MPBI land is developed to its industrial zoned capacity, the pond<br />

needs to be enlarged beyond its lease area. An area that could be used is between SES13, the existing<br />

wetland, and the proposed MPBI development. If MPBI land remains undeveloped the pond will remain within<br />

the current TCC leased area.<br />

The design will be able to treat and discharge <strong>storm</strong><strong>water</strong> to accepted regional <strong>water</strong> quality levels. Detailed<br />

drawings and in<strong>for</strong>mation of this wetland can be found in Appendix 10.<br />

• The total volume of <strong>earthworks</strong> required <strong>for</strong> NZTA TEM works in the proposed <strong>storm</strong><strong>water</strong> treatment<br />

wetland is approximately 4,500m³ - 5,500m 3 . This is the subject of this application.<br />

• The total volume of <strong>earthworks</strong> required <strong>for</strong> TCC works in the proposed <strong>storm</strong><strong>water</strong> treatment wetland is<br />

16,000m³ - 20,000m 3 . This will be the subject of a future application.<br />

• The total volume of <strong>earthworks</strong> required <strong>for</strong> the MPBI portion of the <strong>storm</strong><strong>water</strong> treatment wetland is<br />

17,000m³ - 24,000m 3 . This will be the subject of a future application.<br />

Status: Final Page 71 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE