01.05.2014 Views

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

Dust control plans must establish clearly which control measures are intended to prevent<br />

emissions of dust particulates. Making the ef<strong>for</strong>t to produce comprehensive plans which are easy<br />

to follow will save time and money in processing the application.<br />

The in<strong>for</strong>mation included in dust control plans should correspond to the scale and significance of<br />

the proposal.<br />

a) What dust control measures are proposed and what are the expected efficiencies of these<br />

measures?<br />

• See description of the proposal and appendices application<br />

5 Alternatives and mitigation<br />

a) Where it has been determined that the proposed activity will result in a significant adverse effect on<br />

the environment, can the impacts of the proposed activity be reduced or avoided by adopting an<br />

alternative methodology, or changing the end use of the site?<br />

• See assessment of effects in application<br />

6 Monitoring<br />

a) What, if any, monitoring do you propose to carry out to ensure that the discharge does not have<br />

any adverse effect?<br />

• See assessment of effects in application<br />

7 Persons likely to be directly affected:<br />

For your application to be considered <strong>for</strong> non-notification, you must gain the written approval of all<br />

persons who may be affected by the proposal. Please specify below those parties who may be<br />

affected (or interested by your proposal).<br />

• See consultation section in application<br />

Persons who may be interested or affected and consultation undertaken<br />

• See consultation section in application<br />

Status: Final Page 20 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!