01.05.2014 Views

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

Where your discharge could have a significant adverse effect on the environment a more detailed<br />

environmental assessment is required in accordance with the Fourth Schedule of the Resource<br />

Management Act 1991.<br />

a) Comment on the possible effect the discharge may have on the quality of the receiving<br />

environment and users:<br />

See Application<br />

b) Within a reasonable distance downstream, down ground<strong>water</strong> gradient or in the vicinity of the<br />

discharge are there any:<br />

1 Obvious signs of biota (e.g. fish, eels, insect life, aquatic plants) Yes No<br />

2 Areas where food is gathered Yes No<br />

3 Water abstractions Yes No<br />

4 Wetlands Yes No<br />

5 Recreational activities carried out Yes No<br />

6 Areas of particular aesthetic or scientific value (e.g. archaeological sites) Yes No<br />

7 Areas or aspects of significance to Iwi Yes No<br />

8 Shallow ground<strong>water</strong> Yes No<br />

9 Springs Yes No<br />

If you have answered yes to any of the above, describe what effects your discharge may have and<br />

the steps you propose to take to avoid or mitigate these.<br />

See Application<br />

4 Alternatives<br />

a) What alternative methods of disposal or discharge locations have you considered?<br />

See Application<br />

b) Why did you choose the proposed method of disposal and location point?<br />

See Application<br />

5 Maintenance and contingency<br />

How will the equipment controlling the discharge be operated and maintained to prevent equipment<br />

failure, and what measures will be implemented to ensure that the effects of any malfunction are<br />

remedied?<br />

See Application<br />

Status: Final Page 32 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!