1. Not permitted by a rule in this regional plan, and<br />
<strong>2.</strong> Not restricted discretionary status under a rule in this regional plan, and<br />
3. Not prohibited by Rule 49,<br />
Is a discretionary activity.<br />
Explanation/Intent of Rule<br />
To allow Environment Bay of Plenty to assess any damming or diversion activity that will have<br />
greater than minor adverse effects on the environment, on a case by case basis through the<br />
resource consent process.<br />
Assessment Criteria<br />
When assessing resource consent applications under this rule, Environment Bay of Plenty will have<br />
particular regard to, but not be limited to, the following provisions as appropriate to the source of the<br />
proposed <strong>water</strong> take:<br />
Objective 4, 5, 6, 8, 42, 47, 55, 73, 75<br />
Policy 5, 11, 14, 15, 17, 18, 19, 20, 21, 65, 81, 83, 84, 100, 133, 134<br />
Method 13, 17, 18, 20, 21, 56, 60<br />
1.4 Activities in the beds of rivers streams and lakes<br />
The <strong>Mangatawa</strong> Drain is considered to be a “Land Drainage Canal” or a “modified <strong>water</strong> course” as<br />
defined by the RWLP Dec 2002, Definition of Terms, Pg 436.<br />
Land Drainage Canal – a modified <strong>water</strong>course that is part of a land drainage scheme.<br />
For the purposes of this regional plan the term ‘Land Drainage Canal’ is limited to the following,<br />
(g) ….. Bruce R/SH2, <strong>Mangatawa</strong>-SH2, Railway, Farmlands;<br />
However as these works will include new capital works, Rule 71 applies and the works are<br />
Discretionary.<br />
Rule 71 Discretionary – Activity in the Beds of Streams, Rivers and Lakes<br />
Unless provided <strong>for</strong> by another rule in this regional plan, the:<br />
1. Use, erection, reconstruction, placement, alteration, extension, removal, or demolition of any<br />
structure or part of any structure in, on, under, or over the bed of a stream, river or lake,<br />
<strong>2.</strong> Excavation, drilling, tunnelling or other disturbances to the bed of a stream, river or lake,<br />
3. Introduction of planting of any plant or any part of any plant in, on, or under the bed of a stream,<br />
river or lake,<br />
4. Disturbance, removal, damage or destruction of any plant or any part of any plant in, on, or<br />
under the bed of a stream, river or lake,<br />
5. Deposition of any substance in, on, or under the bed of a stream, river or lake,<br />
Beca // 22 December 2008 // Page 4<br />
// NZ1-1349440-2 0.2