1. Not permitted by a rule in this regional plan, and<br />

<strong>2.</strong> Not restricted discretionary status under a rule in this regional plan, and<br />

3. Not prohibited by Rule 49,<br />

Is a discretionary activity.<br />

Explanation/Intent of Rule<br />

To allow Environment Bay of Plenty to assess any damming or diversion activity that will have<br />

greater than minor adverse effects on the environment, on a case by case basis through the<br />

resource consent process.<br />

Assessment Criteria<br />

When assessing resource consent applications under this rule, Environment Bay of Plenty will have<br />

particular regard to, but not be limited to, the following provisions as appropriate to the source of the<br />

proposed <strong>water</strong> take:<br />

Objective 4, 5, 6, 8, 42, 47, 55, 73, 75<br />

Policy 5, 11, 14, 15, 17, 18, 19, 20, 21, 65, 81, 83, 84, 100, 133, 134<br />

Method 13, 17, 18, 20, 21, 56, 60<br />

1.4 Activities in the beds of rivers streams and lakes<br />

The <strong>Mangatawa</strong> Drain is considered to be a “Land Drainage Canal” or a “modified <strong>water</strong> course” as<br />

defined by the RWLP Dec 2002, Definition of Terms, Pg 436.<br />

Land Drainage Canal – a modified <strong>water</strong>course that is part of a land drainage scheme.<br />

For the purposes of this regional plan the term ‘Land Drainage Canal’ is limited to the following,<br />

(g) ….. Bruce R/SH2, <strong>Mangatawa</strong>-SH2, Railway, Farmlands;<br />

However as these works will include new capital works, Rule 71 applies and the works are<br />

Discretionary.<br />

Rule 71 Discretionary – Activity in the Beds of Streams, Rivers and Lakes<br />

Unless provided <strong>for</strong> by another rule in this regional plan, the:<br />

1. Use, erection, reconstruction, placement, alteration, extension, removal, or demolition of any<br />

structure or part of any structure in, on, under, or over the bed of a stream, river or lake,<br />

<strong>2.</strong> Excavation, drilling, tunnelling or other disturbances to the bed of a stream, river or lake,<br />

3. Introduction of planting of any plant or any part of any plant in, on, or under the bed of a stream,<br />

river or lake,<br />

4. Disturbance, removal, damage or destruction of any plant or any part of any plant in, on, or<br />

under the bed of a stream, river or lake,<br />

5. Deposition of any substance in, on, or under the bed of a stream, river or lake,<br />

Beca // 22 December 2008 // Page 4<br />