It should be noted that while the TCC District Plan specifies a 2% AEP flood level <strong>for</strong> Papamoa of<br />

4.5m RL recent work in the Wairakei <strong>catchment</strong> has focussed also on the 1% AEP events with<br />

maximum flood level of 4.6m RL. Both have been considered in the per<strong>for</strong>mance target <strong>for</strong> this<br />

work.<br />

<strong>2.</strong>5 Results<br />

The mitigation and engineering measures listed in Section <strong>2.</strong>1 and per<strong>for</strong>mance results are reported<br />

in this section. The table below summarises the 10%, 2% and 1% AEP <strong>storm</strong> event results. The<br />

long section taken on the centreline of the highway is included in Appendix D. Illustrated on the<br />

long section are the 1% AEP hydraulic grade line and the stop bank levels at Top spill and Bruce<br />

spill. The results reported in the following two Tables below shows that the spill rate across the<br />

highway at Bruce Road will increase with mitigation but the flood depth will decrease. The reason<br />

<strong>for</strong> this result is that more <strong>water</strong> is diverted downstream with the mitigation measures and the spill at<br />

Bruce will occur over a longer section of the highway.<br />

Table 6 – 10% AEP Storm Event<br />

Top Spill<br />

Bruce Road<br />

Existing Future Existing Future<br />

Flood depths over TEM (mm) 280 0 290 0<br />

Spill rate (m 3 /s) 16.68 0 <strong>2.</strong>86 0<br />

Spill volume (m 3 ) 144,154 0 35,576 0<br />

P1 - Central P2 – East P3 – West<br />

Existing Future Existing Future Existing Future<br />

Flood levels<br />

(mRL)<br />

8.19 8.07 8.23 8.22 4.96 4.91<br />

Flood<br />

residence<br />

time (hours)<br />

1<strong>2.</strong>0 8.5 9.0 8.7 10.4 4.9<br />

The flood residence time is based on time above the following levels. These levels were taken in each <strong>catchment</strong> as follows: P1: 7.15mRL; P2: 7.5mRL<br />

and P3: 4.6mRL and represent time that ponding occurs out of channel, upstream (south) of the railway<br />

Beca // 17 March 2009 // Page 11<br />

3932036 // NZ1-1604459-15 0.15 Rev A