NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

8.5.3 Tauranga Eastern Motorway Tangata Whenua Advisory Group<br />

A series of joint Tangata Whenua <strong>for</strong>ums were organised and held in May, July, September, October, November,<br />

and December 2008, and February 2009 where representatives from the following iwi and hapu were in<br />

attendance to discuss the <strong>earthworks</strong> protocol <strong>for</strong> the project and the NZHPT application:<br />

1. Ngaiterangi;<br />

<strong>2.</strong> Nga Potiki;<br />

3. Ngati Pukenga;<br />

4. Te Arawa;<br />

5. Waitaha;<br />

6. Tapuika; and,<br />

7. Ngati Whakaue.<br />

The TEM TWAG group discussed the final changes to the Earthworks protocol at the December 1 st 2008<br />

meeting. While this application has been discussed and presented to this group in only a minor way, the Hapu<br />

affected by the application have been met with separately as described above. It is envisaged that the<br />

Earthworks Protocols will be applied to the site. This provides continuity <strong>for</strong> the project as a whole with the<br />

rest of the TEM project <strong>consents</strong>.<br />

Status: Final Page 81 April 2009<br />

Project Number: 3932036<br />

NZ1-1552092-<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE