01.05.2014 Views

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

2. Mangatawa catchment consents for earthworks, storm water ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10<br />

Hungahunga & Toroa<br />

A further tongue of raised Papamoa ignimbrite extends across the proposed<br />

construction corridor in the vicinity of the Kairua Road SH2 intersection. The place<br />

names of Hungahunga and Toroa are provided on survey plan ML 8133 which may<br />

also indicate further settlement sites and associated archaeological remains in this<br />

area. The only section of the ridge affected by the proposed construction corridor is<br />

located within extensively modified railway reserve land on the south-western side of<br />

SH <strong>2.</strong><br />

Figure 9. Part survey plan ML 8133 showing the low ridge extending across SH 2 (pink Line)<br />

and associated place names Otaimatua, Hungahunga, Toroa and Upuhue Pa to the south.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!