NZ Transport Agency and Tauranga City Council<br />

<strong>Mangatawa</strong> Drain Flood Bypass and TEM Storm<strong>water</strong> AEE<br />

• Storm<strong>water</strong> management under the ARC guidelines and the behaviour of <strong>storm</strong><strong>water</strong> in wet and dry swales.<br />

• Water take <strong>for</strong> dust suppression.<br />

• Draft landscape plans particularly vegetation species.<br />

• Support <strong>for</strong> a project specific TEM Tangata Whenua Advisory Group (TEMTWAG).<br />

The Tauranga Eastern Motorway Tangata Whenua Advisory Group was <strong>for</strong>med to facilitate discussion and<br />

agreement on cultural matters associated with the project. The <strong>for</strong>mation of protocols and agreements<br />

regarding <strong>earthworks</strong> is one such possible outcome.<br />

8.5.2 <strong>Mangatawa</strong> Floodway Application Hui<br />

The following Iwi and Hapu have an interest in this specific proposal and a record of their views is summarised<br />

below:<br />

1. Ngaiterangi Iwi;<br />

<strong>2.</strong> Nga Potiki Hapu;<br />

3. Ngati Pukenga Iwi;<br />

4. Ngati He Hapu;<br />

5. Waitaha;<br />

6. Ngai Tukairangi Hapu.<br />

Ngaiterangi<br />

A cultural impact assessment undertaken <strong>for</strong> the TEM project and Ngaiterangi instructed that it be used <strong>for</strong> this<br />

assessment and is provided in Appendix 5 of the application. On receipt of this Assessment of Environmental<br />

Effects they may have additional responses which will be recorded and provided to EBOP and TCC.<br />

Nga Potiki<br />

A hui was held with Nga Potiki on 14th October 2008 regarding the <strong>Mangatawa</strong> Floodway and TEM project.<br />

The hui discussed the options and possible solutions concerning reducing flooding in the Wairakei and<br />

Maranui <strong>catchment</strong>s while managing the <strong>storm</strong><strong>water</strong> generated by the TEM.<br />

Some of the concerns relevant to the effect of this application raised at this hui are summarised as follows:<br />

• An interest in the species of vegetation used in swales to be sure they are native.<br />

• The source of the fill <strong>for</strong> earth works and a concern that it not be waahi tapu.<br />

• The volume of <strong>water</strong> in the <strong>Mangatawa</strong> Drain and the potential <strong>for</strong> increased flooding of the MPBI land.<br />

Status: Final Page 79 April 2009<br />

Project Number: 3932036<br />